My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 Agreement with HDR Engineering, Inc. to Conduct the First Street Multimodal Boulevard Study
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/20/2025
>
Item 18 Agreement with HDR Engineering, Inc. to Conduct the First Street Multimodal Boulevard Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2025 3:23:53 PM
Creation date
5/14/2025 3:23:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Public Works
Item #
18
Date
5/20/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana | First Street Multimodal Boulevard Study <br />RFP NO. 25-029 | D. Firm and Team Experience <br />13 <br />Relevant Project Experience <br />Table 2: Relevant Project Experience <br />Table 2 below outlines our recent relevant <br />experience as it relates to the anticipated scope, <br />project elements, and goals of the First Street <br />Multimodal Boulevard Study. Further information <br />for each of these projects is provided on the <br />following page. <br />RELEVANT PROJECT <br />DESIGN ELEMENTS <br />RELEVANCE TO SCOPE OF SERVICES <br />TASK 1 <br />PROJECT <br />MANAGEMENT <br />TASK 2 <br />EXISTING ANALYSIS <br />AND ASSESSMENT <br />TASK 3 <br />OUTREACH AND <br />ENGAGEMENT <br />TASK 4 <br />CONCEPTUAL <br />PLANNING <br />TASK 5 <br />PLAN <br />PRODUCTION <br />CLIENT/PROJECT Bikeway DesignADA Compliance/Pedestrian ConnectivityTransit/Bus PriorityTraffic Signal/ITSRoadway EngineeringLandscaping/Water Quality TreatmentMicrosimulationTravel Demand ForecastingAdministration/Project ManagementKick-Off and PDT MeetingsAgency Project OversightGrant ReportingExisting ConditionsExisting Multimodal Facilities MapExisting Corridor ModelEquityTargeted Stakeholder MeetingsWebsite, Social Media, and SurveysCommunity WorkshopsCommunity EventsIdentify Constraints and OpportunitiesProposed Alternatives DevelopmentProgrammatic Cost EstimatesAlternatives EvaluationRisk RegisterIdentify Financial NeedsImplementation StrategyFeasibility StudyEnvironmental Clearance30% Design60% - 90% Design100% Design/Bid DocumentsCity of Santa Ana <br />Fairview Street Design Services and Bridge Replacement <br />OCTA <br />South Orange County Multimodal Transportation Study <br />OCTA <br />SR 55 Widening PS&E <br />City of Laguna Beach <br />Laguna Canyon Road PSR-PDS <br />City of El Monte <br />Valley Boulevard Complete Street Feasibility Study* <br />LA Metro <br />Lakewood/Rosemead Corridor Enhanced Transit Assessment <br />LA Metro <br />North Hollywood to Pasadena BRT <br />City of Culver City <br />Transportation Planning On-Call, Various Task Orders <br />San Joaquin County DPW <br />Country Club Boulevard Complete Streets Corridor Plan <br />*Previous project of Dawn Wilson
The URL can be used to link to this page
Your browser does not support the video tag.