My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 Agreements with Butier Engineering, Inc., Z&K Consultants, Inc., Berg & Associates, Inc., Psomas, Willdan Engineering, and EEC Environmental
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/20/2025
>
Item 20 Agreements with Butier Engineering, Inc., Z&K Consultants, Inc., Berg & Associates, Inc., Psomas, Willdan Engineering, and EEC Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 5:34:17 PM
Creation date
5/14/2025 3:30:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Public Works
Item #
20
Date
5/20/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 7822 E. I"" Street <br />Suite 404 <br />Tustin, CA 92780 <br />Tel (714) 832-7222 <br />Fax (714) 832-721 1 <br />February 3, 2025 <br />Mr. Jose Medina, PE <br />City of Santa Ana — Public Works Agency <br />220 South Daisy Avenue, M-85 <br />Santa Ana, CA 92703 <br />Subject: Water Resources Construction Management and Inspection <br />Services: RFP No. 25-011 <br />Dear Mr. Medina: <br />The Butier Team is pleased to submit one (1) hard copy in a separately sealed <br />envelope and electronic submittal of our fee proposal on PlanetBids for the above - <br />referenced project. Our submittal fully responds to the RFP issued on January 14, <br />2025 and Addendums No. 1 and No. 2. Our proposal will be valid for a minimum of <br />180 days following the proposal deadline. <br />CLARIFICATIONS: <br />Rates for the Construction Management Team <br />Vehicles, computers, computer software, printers, cell phone service, broadband <br />service, office supplies, technical reference materials, and personal protective <br />equipment (PPE) including hard hats, safety boots, work gloves, safety glasses, and <br />other PPE as required shall be billed at the attached rates per labor hour charged to <br />the project. <br />Excluded from Rates <br />Trailer rental costs, installation of utilities, cost of utilities, cost of sanitary services, <br />broadband / high-speed connections, janitorial, and furniture. <br />Field Office <br />We have assumed the Contractor and/or City of Santa Ana will provide the <br />necessary office space to house the field CM team. <br />We look forward to continuing our working relationship with the City on this <br />important procurement. If you have any questions regarding the attached proposal, <br />please contact me at (714) 832-7222 or jrbutier@butier.com. <br />Sincerely, <br />BUTTER Engineering, Inc. <br />Construction Managers, Cons r)6 Engineers <br />Mark M. Butier, Jr. <br />President/CFO <br />BUTIERpRif fJPQbI0�r1a <br />
The URL can be used to link to this page
Your browser does not support the video tag.