My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 Agreements with Butier Engineering, Inc., Z&K Consultants, Inc., Berg & Associates, Inc., Psomas, Willdan Engineering, and EEC Environmental
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
05/20/2025
>
Item 20 Agreements with Butier Engineering, Inc., Z&K Consultants, Inc., Berg & Associates, Inc., Psomas, Willdan Engineering, and EEC Environmental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 5:34:17 PM
Creation date
5/14/2025 3:30:29 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Agency
Public Works
Item #
20
Date
5/20/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTANTS <br />BUILDING SOLUTIONS <br />OVERTIME RATE OVERTIME OVERTIME RATE <br />STAFF REGULAR TIME RATE' (MON-FRI)2 RATE (SAT)' (SUN/HOLIDAY) <br />Principal.................................................................................... $242.00 - - - <br />Senior Construction Manager ...................................................... $240.00 - - - <br />QA/QC Manager......................................................................... $195.00 - - - <br />Senior Program Manager............................................................. $212.00 - - - <br />Program Manager....................................................................... $206.00 - - - <br />Senior Project Manager............................................................... $186.00 - - - <br />Project Manager......................................................................... $180.00 - - - <br />Assistant Project Manager.......................................................... $142.00 - - - <br />Resident Engineer...................................................................... $220.00 - - - <br />Assistant Resident Engineer........................................................ $197.00 - - - <br />Construction Manager................................................................ $178.00 - - - <br />Assistant Construction Manager ................................................. $159.00 - - - <br />Labor Compliance...................................................................... $146.00 - - - <br />Project Manager/Office Engineer ................................................. $147.00 - - - <br />SWPPP Practitioner.................................................................... $177.00 - - - <br />Senior Landscape Architect........................................................ $189.00 - - - <br />PE Licensed Inspector (Prevailing and Non -Prevailing Wage)........ $202.00 ........... $282.00 ..... $282.00 ............ $376.00 <br />PE Licensed Inspector (Special Shift)3,4,5..................................... $208.00 ............ $297.00 ..... $297.00 ............ $396.00 <br />Senior Construction Inspector (Prevailing Wage)3,5 ..................... $198.00 ............ $243.00 ..... $243.00 ............ $324.00 <br />Senior Construction Inspector (Special Shift)3,4,5 ........................ $208.00 ............ $279.00 ..... $279.00 ............ $372.50 <br />Accessibility Expert/CASp Inspector ............................................ $208.00 ............ $312.00 ..... $312.00 ............ $416.00 <br />DSA/OSHPD Inspector of Record ................................................ $202.00 ............ $303.00 ..... $303.00 ............ $402.00 <br />Deputy Inspection (Prevailing Wage)3,5........................................ $189.00 ............ $283.50 ..... $283.50 ............ $378.00 <br />Public Works Inspector (Non -Prevailing Wage) 5........................... $172.00 ............ $258.00 ..... $258.00 ............ $344.00 <br />NOTES &ASSUMPTIONS <br />Positions are subject to overtime rates billed at 1.5 times the regular rate for all time over eight (8) hours in a single day or work <br />performed on Saturdays. Double time rates apply for work performed on Sundays and holidays. The hourly rates include wages, <br />fringe benefits, and general and administrative overhead and fee, as well as typical supplies, tools, and equipment required to <br />perform services. Construction management software is not included in the base rate. <br />1. The listed rate applies to the first four hours of overtime during the week and/or the first eight hours of overtime on Saturdays. <br />All overtime beyond four hours during the week or eight hours on Saturdays is billed at the Sunday/holiday rate. <br />2. Prevailing Wage Rates are subject to increases per the State of California's Department of Industrial Relations Wage Rate <br />Determinations. Z&K's billing rates will increase in line with the DIR increase, plus overhead and profit. The current rates are <br />based on Determination SD-23-63-3-2023-2D, issued on 812212023. <br />3. A Special Shift is defined as any shift starting after 5:00 PM and before 6:00 AM. <br />4. Minimum callout requirements for inspection staff are in line with Industrial Welfare Commission Order #16-2001: <br />o Cancellation of 8 hours scheduled inspection after inspector's arrival on site: 4-hour minimum. <br />o Cancellation of 4 hours scheduled inspection after inspector's arrival on site: 2-hour minimum. <br />5. For contracts involving public works inspection services, Z&K requires the awarding public agency to complete DIR form <br />PWC-100 forZ&K as the prime contractor, specific to the awarded contract name and amount. A half-hour per week, per <br />inspector, will be billed for labor compliance on all Prevailing Wage inspection assignments. <br />Overall Notes: <br />• Reimbursable Expenses (Other Direct Costs): Ordinary identifiable non -salary costs directly attributable to the project <br />(e.g., regular commuter travel costs, standard equipment tools, and software) are included in the estimated fee. <br />Extraordinary expenses (such as oversized and/or color reproduction costs, vehicle identification decals, site facility hard <br />phone lines or internet service, non -commuter project mileage, remote travel over 50 miles one-way, overnight <br />postage%ouriers, etc.) will be billed at actual cost plus 15% for overhead and administration. Travel costs to <br />casting/fabrication yards or batch plants will include the hourly billing rate plus travel expenses as listed in the Caltrans <br />Travel Guide (State rates). Mileage is billed at the current IRS rate ($0.655/mile). An allowance for extraordinary charges is <br />included as Other Direct Costs (ODC) in the fee table. Extraordinary charges beyond the estimated ODC allowance will not <br />be billed unless specifically included in the contract or pre -approved by the Client in writing. <br />• Fees for Subconsultant Services: Billed at actual cost plus 15% to cover overhead and administration. <br />• Web -Based Contract Administration: Selected/specified cloud -based service billed at cost plus 15%. <br />• Escalation: Unless specified otherwise (such as for prevailing wage personnel), all billing rates are subject to annual review <br />for Consumer Price Index escalation or 3%, whichever is greater. <br />17130 Van Buren Blvd, Suite 122 1 Riverside, CA 92504 1951.310.7470 1 www.zandkconsultants.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.