My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLEINFELDER, INC. (8)
Clerk
>
Contracts / Agreements
>
K
>
KLEINFELDER, INC. (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2025 2:15:22 PM
Creation date
5/20/2025 2:09:09 PM
Metadata
Fields
Template:
Contracts
Company Name
KLEINFELDER, INC.
Contract #
A-2025-018-06
Agency
Public Works
Council Approval Date
2/18/2025
Expiration Date
2/17/2028
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Surveyors, Inc. PRE ART —, <br />—�� PREVAILING WAGE RATE SHEET <br />July 22, 2024 <br />Pricing on this document is valid for 90 days from the date above. <br />Prepared <br />Company Name Attn: Contact Name, Phone Number <br />Project NamFor:e: <br />Project Name, City of Project <br />Project Location: <br />Example: 16061 Avenida Venusto @ 18" RCP SD Tie -In <br />Total Number of Estimated Potholes: <br />Project Management & Report Preparation <br />Project Management (USA Mark -Out / Standby Coord. / Pothole Layout) <br />Report drafting <br />Prevailing Wage Processing (Apprentice Reporting and Certified Payroll) <br />Specialty Training <br />Potholing <br />Potholing Daily Rate (2-man crew) <br />AAincludes shoulder closure or narrow lane closure, backfill and AC cold patch <br />Third Laborer for Hot Patch Cap <br />Mobilization (portal-to-portal) <br />Potholing 1-Man / 1-Vacuum Truck Hourly Rate <br />Manhole Dips <br />Haulage and Dump Fee (Non -Hazardous only) <br />Wet & Dry Utility Locating <br />Locating - 1 Man & Equipment (Elec, Mag, Sonic, GPR) <br />Locating - CCTV Truck and 2 Crew <br />Traffic Control <br />Traffic Control/ROW plans - 11"X17" <br />Permit processing <br />Minimal Traffic Control Equipment (w/CCTV only) <br />Bike Lane, Shoulder or Narrow Lane Closure (Excludes Arrow Board) <br />Small Intersections/Standard Lane Closures (Up to 500' + tapers) <br />Large Intersections/Multiple Lane Closures <br />Additional Arrow Board <br />Night Work Premium <br />Certified Flagman / Addt'I Laborer <br />No.: <br />0 <br />hours @ <br />165 <br />per hour= <br />$0 <br />No.: <br />0 <br />hours @ <br />125 <br />per hour= <br />$0 <br />No.: <br />0 <br />hours @ <br />125 <br />per hour= <br />$0 <br />No.: <br />0 <br />hours @ <br />140 <br />per hour= <br />$0 <br />Sub -total <br />$0 <br />No.: <br />0 <br />@ <br />$4,000 <br />per day= <br />$0 <br />No.: <br />0 <br />@ <br />$1,600 <br />perday= <br />$0 <br />No.: <br />0 <br />@ <br />400 <br />per hour= <br />$0 <br />No.: <br />0 <br />@ <br />275 <br />per hour= <br />$0 <br />No.: <br />0 <br />@ <br />100 <br />each= <br />$0 <br />No.: <br />0 <br />@ <br />350 <br />per load= <br />$0 <br />Sub -total <br />$0 <br />No.: <br />0 <br />hours@ <br />205 <br />per man hour- <br />$0 <br />No.: <br />0 <br />hours@ <br />410 <br />per man hour- <br />$0 <br />Sub -total <br />$0 <br />No.: <br />0 <br />@ <br />No.: <br />0 <br />hours @ <br />No.: <br />0 <br />each @ <br />No.: <br />0 <br />each @ <br />No.: <br />0 <br />each @ <br />No.: <br />0 <br />each @ <br />No.: <br />0 <br />days @ <br />No.: <br />0 <br />nights @ <br />No. Flagmen 0 <br />$1451, <br />Per hour for <br />Concrete and Asphalt Patching <br />Aquaphalt Permanent Patch w/Saw Cut <br />No.: <br />0 ` <br />@ <br />AC Hot Mix Patch w/Saw Cut (Crew of 2) <br />No.: <br />0.. <br />@ <br />AC Hot Mix Patch Grind and Overlay (Crew of 4) <br />No.: <br />0 <br />@ <br />Coring -12"Diameter <br />No.: <br />0 <br />@ <br />Sidewalk Panel Replacement <br />No.: <br />0:, <br />XBD2024 <br />nitials <br />175 <br />p/sheet= <br />$0 <br />120 <br />per hour= <br />$0 <br />150 <br />each= <br />$0 <br />350 <br />each= <br />$0 <br />550 <br />each= <br />$0 <br />750 <br />each= <br />$0 <br />150 <br />per day= <br />$0 <br />350 <br />per night= <br />$0 <br />0 <br />hours= <br />$0 <br />Sub -total <br />$0 <br />150 <br />each= <br />$0 <br />3 500 <br />per day= <br />$0 <br />6 500 <br />per day= <br />$0 <br />130 <br />each= <br />$0 <br />Call for Quote <br />$0 <br />Sub -total <br />$0 <br />Estimate Total: <br />$@.0® <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.