Laserfiche WebLink
Implementation Timeline <br /> This timeline provides general guidance and understanding of your installation <br /> process. While we typically complete installations 6-8 weeks after locations have <br /> been finalized, delays can occur as noted in the timeline below: <br /> REVIEW LOCATIONS 41 Confirm Camera Locations With Your Sales Representative <br /> FLOCK:Your sales representative will present several viable options for camera locations <br /> CUSTOMER:Review Deployment Plan&approve camera locations <br /> PLEASE NOTE: If Public Works is required to move forward, please obtain approval <br /> FINALIZE LOCATIONS 41 Prepare For Finalized Camera Locations <br /> FLOCK: Confirm Deployment Plane and signed agreement. Flock will move forward with <br /> next steps for locations that don't need permits (minimum 10 locations needed to move <br /> forward with partial installation) <br /> CUSTOMER: Prepare the below items,as needed <br /> • If permits are required,begin application process <br /> • If camera will be AC-powered,hire an electrician/street department <br /> STEP 1 Conduct On-site Survey&Place Flags <br /> FLOCK: Flock technician conducts site survey to (1) evaluate/reconfirm solar or power <br /> access, (2) check line of sight to the road,and (3) evaluate/reconfirm cellular service in <br /> the area.When the technician deems the locations suitable, s/he will place a white flag <br /> at each spot <br /> PLEASE NOTE: If the initially determined locations don't meet Flock standards,we will <br /> evaluate a new location, obtain customer approval,and redo a site survey.This may <br /> push timeline for installation <br /> STEP 2 40 Call 811 <br /> FLOCK: Flock Safety will coordinate with Call 811 to mark each camera location for <br /> underground utilities within a 10-foot radius <br /> PLEASE NOTE:Call 811 is a government service, so turnaround times may vary and is <br /> outside of Flock control <br /> STEP 3 40 Schedule Installation <br /> FLOCK: Flock will (1) ship any site specific material that the technician does not have <br /> locally (2) schedule the installation date <br /> STEP 41 Install&Validate Cameras <br /> FLOCK:After installation,your Onboarding Specialist will confirm that cameras are <br /> capturing footage well and functioning properly.They will then give you full access to <br /> the system along with helpful training resources <br /> ONGOING-AS NEEDED 41 Finalize Any Installation Needs <br /> FLOCK:While we typically complete installations within 4 weeks of finalizing locations, <br /> delays may occur due to external factors. In these instances,we will continue to work <br /> through this process until your cameras are fully installed and operational <br /> fi ock safety 2 <br />