My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOCK GROUP, INC.
Clerk
>
Contracts / Agreements
>
F
>
FLOCK GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 4:06:52 PM
Creation date
5/27/2025 10:48:21 AM
Metadata
Fields
Template:
Contracts
Company Name
FLOCK GROUP, INC.
Contract #
A-2025-059
Agency
Police
Council Approval Date
5/6/2025
Expiration Date
5/5/2028
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Infrastructure Implementation <br /> COST: $150 per camera (one time cost) <br /> Included In Scope: <br /> Once designated locations are approved by the customer, as part of the Existing <br /> Infrastructure Implementation Service Flock will perform the following: <br /> • An in-person site survey to confirm the installation feasibility of a location <br /> (location assessment, solar assessment, visibility review, etc.) <br /> o Cameras need sufficient power. Since a solar panel is required per camera, <br /> it can prevent adequate solar power if two cameras and two solar panels <br /> are on a single pole (blocking visibility). Therefore <br /> if relying on solar power, only one camera can be installed per pole. <br /> • Confirm that a location is safe for work by following State utility locating <br /> procedures. <br /> • Each installation may include the following: <br /> o Installation of camera and solar panel or AC adapter box on a suitable <br /> existing pole <br /> ■ Types of existing infrastructure such as existing utility, light, and traffic <br /> signal poles. <br /> ■ Pole no higher than 8'-12' (approval at Flock Safety's discretion) <br /> ■ Flock will provide and mount an AC adapter unit that a qualified <br /> electrician can connect to AC power following our electrical wiring <br /> requirements. Flock is unable to make any AC connections or <br /> boreholes in any material other than dirt, grass, loose gravel (or other <br /> non-diggable material). Electrical work requiring a licensed electrician <br /> and associated costs, not included in the scope. <br /> o Access requiring up to a 14' using an A-frame ladder <br /> o Standard MUTCD traffic control procedures performed by a Flock <br /> technician <br /> • Obtain a business license to operate in the city and state of camera location <br /> flock safety 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.