Laserfiche WebLink
Standard Implementation <br /> COST: $650 per camera (one time cost) <br /> Included In Scope: <br /> Once designated locations are approved by the customer, as part of the <br /> Standard Implementation Service Flock will perform the following: <br /> • An in-person site survey to confirm the installation feasibility of a location <br /> (location assessment, solar assessment, visibility review, etc.) <br /> • Confirm that a location is safe for work by following state utility locating <br /> procedures. Work with local utilities to prevent service interruptions <br /> during the installation <br /> o Engage 811 'Call-before-you-Dig' system to receive legal dig date <br /> o Apply approved markings Coordinate with 811 regarding any necessary <br /> high-risk dig clearances or required vendor meets <br /> • Each installation may include the following: <br /> o Installation of camera and solar panel with standard, 12' above grade <br /> Flock breakaway pole <br /> o Installation of camera and AC adapter that a qualified electrician can connect <br /> to AC power on a suitable existing pole, no higher than 8-12' (approval at <br /> Flock Safety's discretion) <br /> ■ Flock will provide and mount an AC adapter that a qualified electrician can <br /> connect to AC power following our electrical wiring requirements. Flock <br /> is unable to make any AC connections or boreholes in any material other <br /> than dirt, grass, loose gravel (or other non-diggable material). Electrical <br /> work requiring a licensed electrician and associated costs, not included in <br /> the scope. <br /> o Access requiring up to a 14' A-frame ladder <br /> o Standard MUTCD traffic control procedures performed by a Flock technician <br /> • Obtain a business license to operate in the City and State of camera location <br /> frock safety 9 <br />