Laserfiche WebLink
AdvancedImplementation <br /> COST: $1,900 per camera (one time cost) <br /> Included In Scope: <br /> Once Designated Locations are confirmed, as part of the Advanced <br /> Implementation Service, Flock will perform the following: <br /> • An in-person site survey to confirm the installation feasibility of a location <br /> (location assessment, solar assessment, visibility review, etc.) <br /> • Confirm that a location is safe for work by following State utility locating <br /> procedures. Work with local utilities to prevent service interruptions during <br /> the installation <br /> o Engage 811 'Call-before-you-Dig' system to receive legal dig date <br /> o Apply approved markings Coordinate with 811 regarding any necessary <br /> high-risk dig clearances or required vendor meets <br /> • Each installation may include the following: <br /> o Installation of camera and solar panel on a suitable NCHRP 350 or MASH <br /> approved pole. <br /> o Installation of camera and AC adapter that a qualified electrician can <br /> connect to AC power. <br /> ■ Flock will provide and mount an AC adapter that a qualified electrician <br /> can connect to AC power following our electrical wiring requirements. <br /> Flock cannot make any AC connections or boreholes in any material <br /> other than dirt, grass, loose gravel (or other non-diggable material). <br /> Electrical work requiring a licensed electrician and associated costs, 10 <br /> not included in the scope. <br /> o Access requiring up to a 14' A-frame ladder <br /> o Standard MUTCD traffic control procedures performed by a Flock <br /> technician <br /> • Obtain a business license to operate in the City and State of camera location <br /> frock safety 11 <br />