My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOCK GROUP, INC.
Clerk
>
Contracts / Agreements
>
F
>
FLOCK GROUP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2025 4:06:52 PM
Creation date
5/27/2025 10:48:21 AM
Metadata
Fields
Template:
Contracts
Company Name
FLOCK GROUP, INC.
Contract #
A-2025-059
Agency
Police
Council Approval Date
5/6/2025
Expiration Date
5/5/2028
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdvancedImplementation <br /> COST: $1,900 per camera (one time cost) <br /> Included In Scope: <br /> Once Designated Locations are confirmed, as part of the Advanced <br /> Implementation Service, Flock will perform the following: <br /> • An in-person site survey to confirm the installation feasibility of a location <br /> (location assessment, solar assessment, visibility review, etc.) <br /> • Confirm that a location is safe for work by following State utility locating <br /> procedures. Work with local utilities to prevent service interruptions during <br /> the installation <br /> o Engage 811 'Call-before-you-Dig' system to receive legal dig date <br /> o Apply approved markings Coordinate with 811 regarding any necessary <br /> high-risk dig clearances or required vendor meets <br /> • Each installation may include the following: <br /> o Installation of camera and solar panel on a suitable NCHRP 350 or MASH <br /> approved pole. <br /> o Installation of camera and AC adapter that a qualified electrician can <br /> connect to AC power. <br /> ■ Flock will provide and mount an AC adapter that a qualified electrician <br /> can connect to AC power following our electrical wiring requirements. <br /> Flock cannot make any AC connections or boreholes in any material <br /> other than dirt, grass, loose gravel (or other non-diggable material). <br /> Electrical work requiring a licensed electrician and associated costs, 10 <br /> not included in the scope. <br /> o Access requiring up to a 14' A-frame ladder <br /> o Standard MUTCD traffic control procedures performed by a Flock <br /> technician <br /> • Obtain a business license to operate in the City and State of camera location <br /> frock safety 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.