Laserfiche WebLink
Electrician Handout <br /> Electrician Installation Steps : <br /> a <br /> 1. Run AC cable and conduit to the box $ ' " <br /> according to NEC Article 300 and any L g + Y <br /> applicable local codes. The gland <br /> accepts 1/2" conduit. <br /> 2. Open the box using hinges. <br /> 3. Connect AC Mains per wiring diagram <br /> below: <br /> a. Connect AC Neutral wire to the Surge Protector white Neutral wire using the <br /> open position on the lever nut. <br /> b. Connect AC Line wire to the Surge Protector black Line wire using the open <br /> position on the lever nut. <br /> c. Connect AC Ground wire to the Surge Protector green ground wire using the <br /> open position on the lever nut. <br /> 4. Verify that both the RED LED is lit on the front of the box <br /> 5. Close box and zip tie the box shut with the provided zip tie <br /> 6. While still on-site, call Flock, who will remotely verify that power is working <br /> correctly: <br /> Southeast Region - (678) 562-8766 <br /> West-Region - (804) 607-9213 <br /> Central & NE Region - (470) 868-4027 <br /> SURGE PROTECTOR AC=CONVERMA 94V DOW REO PANSL LIQHT CAMETIA <br /> ACA V <br /> MOO <br /> FROAAUGHTPOLE <br /> Bock safety 15 <br />