Laserfiche WebLink
ECS Pacific, Inc. <br />and will retain overall responsibility for the design and construction administration of the project, <br />including verification of building code compliance and integration of our comments and design input <br />into the overall project design. ECS will assist in the evaluation, design review, and construction <br />administration of the following specific areas of the building enclosure: <br />• Areas with reported ongoing moisture intrusion <br />• Below- and at -grade waterproofing <br />• Ground level horizontal waterproofing <br />• Built-up asphalt low -slope roofing <br />• Marble panel cladding, including transitions to adjacent systems <br />• Existing steel window and steel -framed storefront treatment and repair <br />• New steel windows and aluminum -framed entrance systems <br />At this time, we anticipate being able to observe the exterior enclosure systems from interior floor <br />levels, the ground, accessible roofs, or ladders or other scaffolding or aerial boom lift access provided <br />by the contractor. <br />2.1 Assessment and Design Review Phase <br />ECS proposes to perform the following assessment phase services. <br />Document Review <br />Review available existing documentation to better understand the building enclosure <br />systems, components, and potential causes of moisture intrusion. Documentation may include <br />original drawings, investigation reports, and any documentation outlining the systems, products, and <br />details used in the original construction and subsequent repairs or remedial work. <br />Visual Building Enclosure Assessment <br />Visually observe the interior and exterior areas reported to be experiencing moisture intrusion in <br />an effort to determine likely areas causing the reported moisture intrusion. In addition to observing <br />the general areas of the building enclosure outlined above, our visual evaluation will focus on <br />the condition of existing enclosure systems to remain, incorrectly installed or damaged systems/ <br />materials, interfaces between systems, and likely cause of moisture intrusion. We have assumed two <br />staff on site for one day to perform the visual assessment. <br />Assessment Report <br />Prepare a summary letter report with photographs describing our observations, findings, and <br />conceptual recommendations, as appropriate. <br />Design Review <br />Review the updated renovation documents (drawings and specifications) related to the building <br />enclosure systems prepared by Group 4. Conflicts, omissions and constructability concerns in the <br />documents will be highlighted and recommendations provided, as appropriate. The scope of our <br />April 22, 2025 <br />Page 2 <br />