My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Agreement for Delhi Library Branch Security Cameras
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 11 - Agreement for Delhi Library Branch Security Cameras
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:36:25 PM
Creation date
5/28/2025 4:14:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Library
Item #
11
Date
6/3/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clarifications & Exclusions <br />Clarifications: <br />•Work to be performed M-F, 7am-4p, excluding Holidays. <br />•Pricing includes standard ground shipping. <br />•Specialist labor is in Prevailing Wage. <br />•Pricing includes one (1) year warranty on materials. <br />•If additional work is needed, a change order will follow. <br />•Supply chain delays may lead to significant lead times <br />•Siemens has included Milestone Device Licenses. <br />•Siemens proposal is being submitted based on the above means and methods and scope of work <br />provided herein, and pricing is reflective of the above scope of work only. <br />•Siemens requires that this proposal is signed and or included as an exhibit to any contract <br />documentation as our stipulated scope of work. <br />•This agreement will be executed in accordance with the City of Santa Ana Police Department’s <br />Agreement A-2020-202 <br />Exclusions: <br />•Construction permits to be excluded. <br />•Costs associated with schedule acceleration, project meetings, multiple trips onsite due to <br />incompletion of others, or multiple unplanned phases are excluded. <br />•Fiber, coring, conduit is excluded. <br />•Engineer drawings are excluded. <br />•Performance or Payment bonds are excluded. <br />•Patching and Painting is excluded from Siemens scope. <br />•Siemens assumes 120VAC at required locations (server, monitor, switch, etc.) and is excluded from <br />Siemens scope. <br />•Fire caulking currently excluded and assumed provided by others (party providing conduit). <br />Page 5 of 8
The URL can be used to link to this page
Your browser does not support the video tag.