My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-06-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025 Regular
>
Agenda Packet_2025-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:36:26 PM
Creation date
5/28/2025 4:25:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
6/3/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> <br /> <br />11 <br /> <br />The System Vendor shall clearly state and detail out the proposed method in which the proposed TSP <br />system will send priority request messages to and obtain priority request status messages from the traffic <br />signal controller. The consultant shall be responsible for coordination and all integration <br />work with signal system manufacturer (Econolite), to achieve end-to-end functionality of the TSP system. <br /> <br />Subtask 4.4: Detailed Design Documentation <br />The consultant shall submit detailed design documentation for approval by City. The detailed design <br />documents will identify all system components, including any equipment, and provide a narrative <br />description of the function and architecture of the major systems and subsystems proposed by the <br />vendor. The documentation should provide system block diagrams identifying all interfaces between <br />system components, including external systems, that would need to interface with the TSP system. The <br />detailed design documents must include design plans for all hardware installations. The detailed design <br />documents should also include interface control documents and communication specifications, for all <br />internal and external system interfaces, including those between different software and hardware <br />systems within the transit on-board or central CAD/AVL, city communication systems, and traffic signal <br />controllers. <br /> <br />As part of the detail design documentation, the consultant shall provide criteria for Factory Acceptance <br />Testing (FAT) for any hardware needed to be procured for the project. <br /> <br />Hardware and software purchases shall not be conducted prior to the approval of the detailed design <br />documentation. For any and all hardware supplied by the consultant, the consultant shall provide City of <br />Santa Ana with hardware submittals for review and approval. The consultant shall provide copy of the <br />FAT results for approval prior to delivery of the hardware. It shall be the consultant responsibility to <br />provide any ancillary equipment such as cables, mounting rails, etc. with the provided hardware. <br /> <br />Task 4 – Deliverables (One hard copy and an electronic version of each): <br />- Procure Transit Signal Priority System and Hardware <br />- Detailed Design Documentation <br /> <br />V. Task 5: Installation, Integration and Deployment <br /> <br />This task will focus on implementation and configuration and will leverage the Task 2 detailed surveys to <br />implement TSP solutions. The consultant shall provide all labor, equipment, and ancillary items <br />necessary to install, integrate, and deploy a fully operational TSP system. <br /> <br />Subtask 5.1: Implementation Plan <br />An Implementation Plan shall be prepared for review and approval by City of Santa Ana Project <br />Manager prior to the start of any installation work. The plan shall describe all aspects of hardware and <br />software installation. This includes facility and vehicle surveys, communications testing, site <br />preparation, pre-wiring requirements, equipment and vehicle staging, production installation and <br />sequencing, quality assurance and control, and scheduling. The Plan will also describe installation and <br />configuration of all software systems, including the back-office applications, interfaces and web <br />applications, and their respective schedules. <br /> <br />The Plan will describe the power and communication requirements for each piece of equipment and at <br />each installation location. The communication requirements will include a description of any networking <br />equipment necessary to connect the system devices to agency network. <br /> <br />The implementation Plan shall also include criteria for pilot test acceptance which will test various <br /> <br />City Council 17 – 24 6/3/2025
The URL can be used to link to this page
Your browser does not support the video tag.