My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-06-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025 Regular
>
Agenda Packet_2025-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:36:26 PM
Creation date
5/28/2025 4:25:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Council
Date
6/3/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Grand Ave Rehab: 1st to Santa Ana <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP � .. �" ,,, <br />�" <br />• <br />'•,�-:: \ <br />\ <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along Grand Avenue between 1st Street and Santa Ana Boulevard. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Construction 2,675,000 <br />Engineering 297,300 <br />TOTAL 2,972,300 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />GAS TAX 2,675,000 <br />RMRA SB1 297,300 <br />TOTAL 2,972,300 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Alex Bangean, Senior Civil Engineer <br />DATE: <br />17-Apr-2025 <br />6 <br />EXHIBIT 2 <br /> <br /> <br />City Council 21 – 15 6/3/2025
The URL can be used to link to this page
Your browser does not support the video tag.