Laserfiche WebLink
Each owner's [or renter's] interest is subject to the fact that trains operate at different <br />times of the day and night on the railway tracks immediately adjacent to a project site; <br />and that by accepting the conveyance of an interest [or lease agreement] in that project, <br />owner [or renter] accepts all impacts generated by the trains. <br />Posting of Notice of Disclosure in each residential unit. <br />Prior to offering the first residential unit for purchase, lease, or rent, the property owner <br />or developer shall post a copy of the Notice of Disclosure in every unit in a conspicuous <br />location. Also, a copy of the Notice of Disclosure shall be included in all materials <br />distributed for the Project, including but not limited to: the prospectus, informational <br />literature, and residential lease and rental agreements. (Impact 4.8-8) <br />Project Analysis and Conclusion <br />The City determined that no impacts related to the proximity public use airport would not result <br />in impacts would result. Impacts related to exposure of sensitive receptors from excessive <br />groundborne vibration (Impact 4.8-3), potentially significant vibration levels (Impact 4.8-4), <br />ambient noise increase (Impact 4.8-5), periodic noise impacts (Impact 4.8-6), and noise from <br />increased traffic volumes (Impact 4.8-7) were below the level of significance and did not require <br />mitigation. Impacts from noise levels exceeding City noise standards (Impact 4.8-1) and <br />exposure to noise -sensitive land uses (Impact 4.8-2) were less than significant with the <br />implementation of mitigation measures. Impacts causing groundborne vibration and <br />development exposure near the Southern California Regional Rail Authority's (SCRRA) rail line <br />(Impact 4.8-8) and construction activities from project implementation (Impact 4.8-9) were found <br />to be significant and unavoidable. Specific economic, social, or other considerations make <br />infeasible additional mitigation. Specifically, no additional feasible mitigation measures exist that <br />would avoid or substantially reduce these impacts. <br />The proposed adoption of the text regulations identified in Table 1 — Current and Proposed Text <br />Regulations would not require preparation of a supplemental or subsequent EIR because <br />specific development projects are neither included nor required. The new regulations would limit <br />daily operations times and days of week, and maximum noise that could be generated from <br />existing uses. No industrial use shall generate ground vibration perceptible without instruments <br />at any point along the property line of the site except for motor vehicle operations. No vibration <br />shall be produced that is transmitted through the ground and is discernible without the aid of <br />instruments by a reasonable person at the property lines of the site. Vibrations from temporary <br />construction, demolition, and vehicles that enter and leave the subject parcel are exempt from <br />this standard. <br />Any future development within the TZC area requiring discretionary action would continue to be <br />subject to a project -level CEQA review at the time an application is filed for an individual project. <br />Mitigation measures MM4.8-1 through MM4.8-8 would continue to apply. In addition, <br />compliance with the existing regulations and proposed amendments will assure that potential <br />impacts are not exacerbated. This will result in a beneficial impact. Therefore, the existing less <br />than significant and significant and unavoidable noise impacts would not result in new or <br />different impacts. <br />5.9 POPULATION, HOUSING AND EMPLOYMENT <br />This section analyzes the effects to population, housing and employment from implementing the <br />proposed zoning code regulations. <br />Would the project: <br />January 2025 41 Environmental Analysis <br />