My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Public Hearing for Amendments to the Transit Zoning Code
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 24 - Public Hearing for Amendments to the Transit Zoning Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 5:16:07 PM
Creation date
5/28/2025 4:48:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
24
Date
6/3/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MM4.13-18 Applicants for Multi-family/Industrial/Commercial projects shall consider providing <br />preferential parking spaces for ultra -low emission vehicles and alternative fueled vehicles to <br />encourage the use of alternative fuels and ultra -low emission vehicles. (Impact 4.3-1) <br />MM4.13-19 Prior to issuance of a building permit, the applicant shall demonstrate that the <br />proposed Multi -family/ Industrial/Commercial uses building or structure designs incorporate <br />exterior storage areas for recyclables and green waste and adequate recycling containers <br />located in public/common areas pursuant to the adopted standards. Documentation of <br />compliance with this measure shall be provided to the Planning and Building Agency for review <br />and approval. Installation of the identified design features or equipment will be confirmed by the <br />City Building Official prior to issuance of certificate of occupancy. (Impact 4.3-1) <br />MM4.13-20 All common area irrigation areas for Multi-family/Industrial/Commercial projects <br />shall consider systems that are capable of being operated by a computerized irrigation system <br />which includes an onsite weather station/ET gage capable of reading current weather data and <br />making automatic adjustments to independent run times for each irrigation valve based on <br />changes in temperature, solar radiation, relative humidity, rain, and wind. In addition, the <br />computerized irrigation system shall also consider the ability to be equipped with flow -sensing <br />capabilities, thus automatically shutting down the irrigation system in the event of a mainline <br />break or broken head. These features will assist in conserving water, eliminating the potential of <br />slope failure due to mainline breaks, and eliminating over -watering and flooding due to pipe <br />and/or head breaks. (Impact 4.3-1) <br />MM4.13-21 Consideration of installation of solar roofs on homes and businesses to offset the <br />increasing demand for energy and natural gas. (Impact 4.3-1) <br />MM4.13-22 Project applicants shall, where feasible, incorporate passive solar design features <br />into the buildings, which may include roof overhangs or canopies that block summer shade, but <br />that allow winter sun, from penetrating south facing windows. (Impact 4.3-1) <br />MM4.13-23 Use Energy Efficient Roofing Materials. All roofing materials used in <br />commercial/retail buildings at the Mixed -Use Retail Development shall be Energy Star® <br />certified. All roof products shall also be certified to meet American Society for Testing and <br />Materials (ASTM) high emissivity requirements. (Impact 4.3-1) <br />MM4.13-24 All commercial/industrial projects shall, where feasible, include up to 10% <br />renewable energy sources within the project. (Impact 4.3-1) <br />MM4.13-1 through MM4.13-24 would also apply to this impact. (Impact 4.3-2) <br />Project Analysis and Conclusion <br />The City determined that long-term development related to localized air quality impacts from <br />operational emissions (Impact 4.13-1) and operational emissions due to the size of the TZC <br />area with the potential to conflict with AB 32 (Impact 4.13-2) were found to be significant and <br />unavoidable and that specific economic, social, or other considerations make infeasible <br />additional mitigation. Specifically, no additional feasible mitigation measures exist that would <br />avoid or substantially reduce these impacts. <br />Any future development within the TZC area requiring discretionary action would continue to be <br />subject to a project -level CEQA review at the time an application is filed for an individual project <br />Mitigation measures MM 4.13-1 through MM4.13.24 would continue to apply. <br />January 2025 53 Environmental Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.