My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Public Hearing for Amendments to the Transit Zoning Code
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 24 - Public Hearing for Amendments to the Transit Zoning Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 5:16:07 PM
Creation date
5/28/2025 4:48:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
24
Date
6/3/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
705
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.15 CONCLUSION <br />This project proposes amendments to the Transit Zoning Code (SD-84) by way of ZOA No. <br />2024-02 and AA No. 2024-03. These proposed amendments would modify the list of land uses <br />and permit types including the deletion of industrial land uses; amend nonconforming <br />regulations including the addition of an amortization process; amend and add operational <br />standards for allowed uses and nonconforming uses; delete the Industrial Overlay (I-OZ) zone <br />from text and maps; and delete the M1 (Light Industrial) and M2 (Heavy Industrial) suffixes from <br />certain properties within the SD-84 Zoning District boundary as designated on the City of Santa <br />Ana Zoning Map. Refer to Section 3.0 — Description of the Proposed Project. <br />This project would not result in new or more severe environmental impacts than previously <br />addressed in the TZC FEIR, nor has any new information regarding the potential for new or <br />more severe significant environmental impacts have been identified because the project <br />basically limits industrial uses and would not lead to the expansion or intensification of new, <br />expanded or more intensive uses. Therefore, there will be no new or more severe impacts as <br />the result of the implementation of this project, beyond the impacts that have already been <br />analyzed in the TZC FEIR. <br />In taking action on any of the approvals, the decision -making body of the lead agency must <br />consider the whole of the data presented in the TZC FEIR. As outlined in this Addendum <br />analysis, all impacts of the project were fully examined in the TZC FEIR, and the proposed <br />changes do not require substantial changes to the prior -certified EIR or previously adopted <br />mitigation measures. Therefore, the preparation of an Addendum to the existing certified EIR is <br />the appropriate CEQA document to support the City's consideration of the project, as outlined in <br />CEQA Guidelines Sections 15162 and 15164. <br />January 2025 55 Environmental Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.