Laserfiche WebLink
PROJECT TITLE: <br />Main St Rehab: Edgewood to <br />Memory Lane <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />............ <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within along Main between Edgewood and Memory Lane. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Engineering 274,200 <br />TOTAL 274,200 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />RMRASB1 274,200 <br />TOTAL 274,200 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Jason Gabriel, Principal Civil Engineer <br />DATE: <br />17-Apr-2025 <br />8 <br />EXHIBIT 2