Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ADOPTEDPROPOSEDDEPARTMENT <br />MISCELLANEOUS FEE <br />ACCOUNTUNIT <br />FY 24-25 FEESFY 25-26 FEESCHANGES <br />Electrical Fees <br />51603165)Permit Issuance <br />66.8870.06 <br />51603166)Minimum Fee (Nonresidential) <br />89.1693.40 <br />53601167)Electrical Plan Check Fee (when required) <br />65% of Subtotal65% of Subtotal <br />51603168)125 Volt Receptacle Outlets <br />1.771.85 <br />51603169)Light Switches, Occupancy Sensors <br />1.922.01 <br />51603170)Light Fixtures <br />1.281.34 <br />51603171)Air Conditioners, Heat Pumps <br />117.72123.32 <br />51603172)Factory-Wired Units (Solid Hook-Ups) <br />30.1131.54 <br />51603173)Dedicated Circuits (15 or 20 AMP Receptacles) <br />30.1131.54 <br />51603174)Time Clock, Photo-Cell, Time Switch <br />14.6915.39 <br />51603175)Track-Light, Cable Tray, Special Raceway, Plugmold, <br />Each 100 ft.30.1131.54 <br /> Under-Floor Duct, Plug-In Busways, Wiremold, Etc. <br />or fraction thereof <br /> Service Meter, Reset Meter, Subpanel, Switchboard, Motor <br /> Control Center, Transfer Switch, Busduct, or other Distribution <br /> Equipment changes or modifications. <br />82 <br /> <br />