My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON (19)
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 12:43:24 PM
Creation date
6/12/2025 12:43:07 PM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON
Contract #
N-2025-149
Agency
Public Works
Expiration Date
6/1/2035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.27.4-Mobile Home Parks — Residential mobile home communities with <br /> shared parking areas. <br /> 6.27.5-University & Military Housing -- Student or military housing units <br /> or apartments with individual cooking facilities (except conventional <br /> dormitories and barracks with cafeteria type kitchens). <br /> 6.27.6.Timeshares —Vacation property communities with shared-parking <br /> areas managed by an HOA or an equivalent association. <br /> 6.27.7-Public Parking with Dedicated Overnight Resident Passes -- <br /> Public parking lots designated for nearby multi-family residents for <br /> overnight parking. Charging Stations can be open for public use during <br /> day-time hours. <br /> 6.28. Network Service Provider: The third-party entity that will provide <br /> Network Services for the Charging Equipment. The Network Service <br /> Provider will be required to transmit port level data and other information <br /> to SCE complying with Program requirements. <br /> 6.29• Ports: See Charging Stations. <br /> 6.30. Power Levels: Charging Equipment Power Levels. <br /> Level 1 (11-1) Charging: Low power charging, typically at or below <br /> 120 volts. <br /> Level 2 (L2) Charging: Medium power charging, typically delivered <br /> between 220 and 240 volts. <br /> Direct Current Fast Charging (DCFC): Charging equipment that <br /> provide a high-power DC current, and for this program at least 50 <br /> kW, to the electric vehicle's battery without passing through any <br /> onboard AC/DC converter, which means the current is connected <br /> directly to the battery. <br /> 6.31• Preliminary Design: The set of engineered, working drawings of the <br /> Infrastructure. The design includes project specifications, conduit routing, <br /> electrical equipment specifications and calculations, project related Site <br /> improvements and construction details. <br /> 6.32. Program: Also referred to as the Charge Ready Charging Infrastructure <br /> and Rebate Program. This Program is designed to help Program <br /> Participants install the charging Infrastructure needed to enable drivers to <br /> refuel their light-duty electric vehicles. <br /> Page 17 <br /> 11-21-2024 V3.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.