Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ACCOUNT MISCELLANEOUS FEE UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 24-25 FEES FY 25-26 FEES CHANGES <br />ELECTRICAL, PLUMBING AND MECHANICAL PLAN <br />CHECK FEE FOR IDENTICAL, RESIDENTIAL R-3, <br />WITH DETACHED OR ATTACHED GARAGES: <br />Models Only 100% <br />All other identical plans 50% <br />PRELIMINARY REVIEW OF BUILDING <br />STANDARDS COMPLIANCE <br />SIGNS <br />When a permit is required for an illuminated or non -illuminated <br />sign, the owner shall provide the City a cash or surety bond <br />as described in Section 8-1768 through 8-1771 of the Santa Ana <br />Municipal Cade. The amount of the bond shali be established <br />by the Building Official, but shall not be less than $20 per <br />address. <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65%of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />71 <br />(D <br />(D <br />0 <br />C <br />-00 <br />B) � <br />CQ z <br />(D 0 <br />s <br />CD r) <br />CFt C] <br />0 tV <br />C:) <br />O) fV <br />Iv 03 <br />97 <br />Minimum Fee <br />Per I -lour <br />11TS6 <br />