Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2026 FEE SCHEDULE <br />SECTION X <br />ACCOUNT MISCELLANEOUS FEE UNIT ADOPTED PROPOSED FDEPARTME.:7NTFY 24 25 FEES FY 25 26 FEES CHANGE <br />51606 <br />51606 <br />51606 <br />51606 <br />51611 <br />(D <br />cn <br />O <br />C <br />-O Q. <br />W -3 <br />t0 Z <br />M O <br />p ro <br />V O <br />O <br />O <br />IV <br />N Ci) <br />2) In addition to the above noted permit fees, <br />a fee shall be collected for new site improvements, <br />new parking lots, new concrete curb and gutter, and <br />asphalt paving. <br />3) Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />or Sunday inspections(. <br />4) Re -inspection fee assessed under applicable <br />provisions of the Building Code. <br />5) Inspections for which no fee is specifically <br />indicated (minimum charge - one (1) hour( <br />SOLAR ENERGY CODE <br />Any person desiring a permit required by the Solar Energy <br />Code shall, at the time of filing, pay an application, fee of <br />$53.69. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $87.76, <br />99 <br />Minimum Sq. Ft, <br />0.05 <br />0.06 <br />Per Hour <br />11T96 <br />123.16 <br />Per Hour <br />117.56 <br />123.16 <br />Per Hour <br />117.56 <br />123.16 <br />Each Permit <br />56.19 <br />91-85 <br />58.86 <br />96.22 <br />Modified Fee <br />