Laserfiche WebLink
C) <br />N <br />t3) <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2025-2025 FEE SCHEDULE <br />SECTION X <br />ADAPTED PROPOSED DEPARTMENT <br />ACCOUNT MISCELLANEOUS FEE UNIT FY 2�4-25 FEES FY 25-26 FEES CHANGES <br />51504 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />235) <br />Fire Damper <br />236) <br />Install/Repair/Replace Appliance Vent <br />237) <br />Product Conveying System (Flammable Vapors, Fumes, Smoke, Heat) <br />238) <br />Dust Collection System <br />239) <br />Appliance Not Listed <br />24C) <br />System Not Listed (Halon, Smoke Evac, Crematory, Etc.) <br />241) <br />Absorption System <br />Up to 1,000,000 BTU <br />242) <br />1,000,001 to 1,750,000 BTU <br />243) <br />1,750,001 and over <br />2441 <br />Commercial Cooking Equipment (Ovens/Fryers/Etc.) <br />245) <br />Condensate Pump <br />246) <br />Kiln <20cubic feet (includes hood and duct) <br />247) <br />Air Compressor (each includes piping) <br />79,66 <br />83.45 <br />79.66 <br />B3.45 <br />228.82 <br />239.71 <br />228.82 <br />239.71 <br />79.66 <br />83.45 <br />228.82 <br />239.71 <br />95.10 <br />99.63 <br />135.20 <br />141.64 <br />228.82 <br />239.71 <br />52.03 <br />54.51 <br />38.86 <br />40.71 <br />90.24 <br />84.06 <br />80.24 <br />84.06 <br />88 <br />