My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AMTECH ELEVATOR SERVICES (PACIFIC COAST ELEVATOR CORPORATION)
Clerk
>
Contracts / Agreements
>
A
>
AMTECH ELEVATOR SERVICES (PACIFIC COAST ELEVATOR CORPORATION)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 10:26:36 AM
Creation date
6/17/2025 10:23:57 AM
Metadata
Fields
Template:
Contracts
Company Name
AMTECH ELEVATOR SERVICES (PACIFIC COAST ELEVATOR CORPORATION)
Contract #
A-2025-082
Agency
Public Works
Council Approval Date
6/3/2025
Expiration Date
6/30/2028
Insurance Exp Date
12/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- CITY OF SANTA ANA <br /> C. PERFORMANCE REQUIREMENTS <br /> 1. Proposer agrees to maintain the following minimum performance requirements of the elevators <br /> designated below: <br /> a. Speed as certified: +1-5% under any loading condition. <br /> b. Capacity: Safety lower, stop and hold up to 125% rated load. <br /> c. Leveling: +1-318 under any loading condition. <br /> d. Door Closing Time, Thrust and Kinetic Energy shall comply with ANSI Code. <br /> e. Floor to Floor Performance Time: Floor to floor performance time (from time doors starts <br /> closing at one floor to fully opened and level on next successive typical floor, regardless <br /> of loading conditions or direction level).. <br /> 2. In accomplishing the above requirements,. Contractor shall maintain a comfortable elevator ride <br /> with smooth acceleration, retardation and a soft stop. <br /> 8, Door operation shall be quiet and positive with smooth checking at the extremes of travel. <br /> D. HOURS OF SERVICE <br /> 1 The Contractor shall perform all work, except, emergency minor adjustment Gal[back service, <br /> during the regular working hours and the regular working days of the elevator trade. <br /> 2. Should the City request examination,cleaning, lubrication, adjustments, repairs, or replacements <br /> of elevator equipment:be performed during other than regular working hours of the elevator trade, <br /> the Contractor shall absorb the straight time labor changes, and the City will compensate the <br /> Contractor for the overtime bonus hours at the Contractor's normal billing rates <br /> E. -- . , ALL UNITS <br /> 1 N _ -- L <br /> 1. The City is to provide the Contractor with full and free access to the equipment to render service <br /> thereon. Contractor must contact maintenance when on .site at any City locations. <br /> a. Except at the Police Department, where all technicians will be escorted by Police <br /> Department staff, <br /> 2. Contractor shall: <br /> a. Maintain, at all times the original contract speed in feet per minute; <br /> b. Perform all adjustments required to maintain the proper door opening and closing time, <br /> within limits of applicable codes; <br /> c. Check the operating system for each unit or group of units continuously and make <br /> necessary test and corrections to ensure all circuits are correct and time settings are <br /> properly adjusted; and <br /> d. Conduct periodic evaluations of equipment performance, including car speed, door <br /> operations, riding quality, and car leveling. <br /> i. Following such evaluations, the Contractor shall perform adjustment, repairs, and <br /> .replacements required to maintain manufacturer's operating performance. <br /> li, A copy of evaluations will be left with City and reviewed with him on request. <br /> City of Santa Ana RFP No.25.007A Page 23 of 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.