Laserfiche WebLink
5� CITY OF SANTA ANA <br /> Police Department; 60 Civic Center Dr <br /> 9, 2: Montgomery Otis Traction Elevators; 2 Hydro Electric 4 2.400 — - <br /> stops per month <br /> Police Department/Joil: 62 Civic Center Dr <br /> 10, 6: Montgomery Otis Traction Elevators; 1 dumb waiter <br /> per month <br /> Southwest Senior Center: <br /> 11. QUARTERLY SERVICE I <br /> 1: 1 wheelchair lift at stage $ � W_� <br /> per quarter <br /> Garfield Center: 501 N Lacy St 400 ? <br /> 12. 1: Schindler Elevator, 2 stop per month <br /> Navigation Center: 1815 Carnegie Ave $ 400 ! <br /> 13. 1: Modular Elevator MFG, Inc., Hydroelectric 1 stop <br /> per month f <br /> TOTAL ANNUAL COST: <br /> Sub-Total Monthly(Line items 1,2,3A6,7,9, 10, 12, 13 x 12 $ 187,2tIQ <br /> months): <br /> - <br /> Sub-Total[quarterly(Linn; Items 6, 8 and 11 x 4 quarters): $ 4,800 <br /> TOTAL ANNUAL COST(Sum of both sub-totals above): $ 192,040 <br /> LABOR RATES <br /> Same Business Day Service Calls(service calls made by 1:00 p.m.PST). <br /> The Contractor shall quote laborratesand provide explanation as required herein: <br /> 14. Straight Time: $400 mechanic hour: $600 team hour See to the left i <br /> S4001$600 <br /> 15Over Time: $650 mechanic hour. $1,100 team hour See to the left <br /> 501$1 100 <br /> 16. Double Time: $800 mechanic hour: $1,100 team hour See to the left <br /> $8001 V.100 <br /> Next Business Day Service Calls(service calls made after 1:00 p.m. PST). <br /> The Contractor shall quote labor rates and provide explanation as required herein: <br /> 17. Straight Time: $400 mechanic hour: $600 team hour See to the left <br /> 4001$fi00 <br /> 18. Over Time: $650 mechanic hour: $1,100 team hour :,See to the left <br /> $6501$1,100 <br /> 19. Double Time: $800 mechanic hour: $1,100 team hour See to the left <br /> sacoamw <br /> 20, ravel: When applicable, see billing rates above for labor ee to thP IP11 <br /> nl <br /> Otyot Santa Ana RFP No.25.007A Page 88Qt iG?. <br />