10th Street and Flower Street Improvements <br /> October 15, 2024 <br /> Page 3 <br /> As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br /> newspaper on July 4, 2024. The project was also advertised in PlanetBids from June <br /> 25, 2024 to July 30, 2024. Bids were received electronically via PlanetBids on July 30, <br /> 2024. No bid protest was submitted by any of the bidders during the bid protest period. <br /> Bid Results Summary <br /> Rank Bidder's Name Location Base Bid <br /> 1 Vido Samarzich, Inc. Rancho Cucamonga, CA $1,476,719 <br /> 2 Hardy & Harper, Inc. Lake Forest, CA $1,500,000 <br /> 3 Excel Paving Co. Long Beach, CA $1,684,834 <br /> 4 MBC Enterprises, Inc. Westminster, CA $1,770,234 <br /> 5 Axiom Group Los Angeles, CA $1,804,174 <br /> A total of five bids were received and all were deemed responsive. Vido Samarzich, Inc. <br /> submitted the lowest responsive base bid in the amount of$1,476,719 (Exhibit 2). As <br /> specified in the bid documents, the lowest bid shall be determined on the basis of the <br /> Base Bid. Based on the bid analysis and a contractor's reference check, staff <br /> recommends awarding the construction contract to Vido Samarzich, Inc. (Exhibit 3). <br /> Vido Samarzich, Inc. has previously performed work as a prime contractor in the City of <br /> Santa Ana within the last five years, most recently completing the Glenwood Street <br /> Water Main Replacement and Portland Concrete Cement (PCC) Street project. A <br /> reference check was made internally with staff and good reviews were received <br /> regarding the quality of work performed by the contractor on previous projects. <br /> Project Delivery <br /> To deliver a complete project, in addition to the construction contract, the estimated total <br /> project delivery cost includes a budget allocation for construction administration, <br /> inspection, and testing. Construction administration and inspection may be performed <br /> by either Staff or consultants and includes construction management, inspection of the <br /> Contractor's work to ensure contract compliance, workmanship and quality, materials <br /> testing, and implementation of the labor requirements. Any of the allocated construction <br /> administration funds not spent are considered project savings and are returned to the <br /> respective fund balance upon close out of the project. <br /> As indicated in the Cost Analysis (Exhibit 4) and as summarized in the table below, the <br /> estimated total construction delivery cost of the project is $1,845,898. <br /> Project Item Total <br /> Construction Contract Bid Amount $1,476,719 <br /> Construction Administration $118,137 <br /> Inspection $73,836 <br /> Testing $29,534 <br />