(9)
<br /> CITY OF SANTA ANA
<br /> 3.0 PARK RESTROOM MAINTENANCE
<br /> Routine maintenance shall include but not be limited to the following services performed at the
<br /> Work Sites listed in Exhibit III.
<br /> 3.1 Daily Cleaning Schedule (Daily cleaning is to be performed three times per day)
<br /> 3.1.1 Restock all supplies daily so dispensers are completely full. Replace vandalized
<br /> dispensers with approved manufacturer and model dispensers to Park Maintenance
<br /> specifications upon discovery. Dispensers will be provided by the City.
<br /> 3.1 .2 Flush toilets and urinals prior to finishing and add approved products.
<br /> 3.1 .3 Check toilets and urinals for stoppages and use plunger and/or hand auger to unplug.
<br /> Note that the Contractor be unsuccessful in unplugging the toilet or urinal causing the City
<br /> to unclog the unit, and the clog is unplugged by plunger and/or hand auger, the cost for
<br /> this service will be deducted from the Contractor's next monthly invoice.
<br /> 3.1.4 If stoppages cannot be unplugged or if other plumbing problems are noticeable, notify the
<br /> City's Representative immediately via phone and/or email. Contractor shall remove all
<br /> waste from the clogged urinal/commode, clean the urinal/commode and place a plastic
<br /> waste receptacle liner over the unit to protect it from use until a Plumber can clear the
<br /> clog.
<br /> 3.1.5 The contractor will be called to clean up and disinfect the restroom after the mainline or
<br /> clog has been cleared.
<br /> 3.1.6 Remove all stains, dust, litter, debris and otherwise foreign matter on all interior surfaces
<br /> including doors, sills, partitions, floors, walls, ceilings, etc. This includes, but not limited
<br /> to, wads of paper stuck on ceilings, tape, etc.
<br /> 3.1 .7 Empty, clean, and sanitize receptacles inside and out.
<br /> 3.1.8 During the 1 st cleaning, the contractor shall pressure wash the interior and 25' around the
<br /> exterior of the restroom with bio-based scented disinfecting.
<br /> 3.1.9 Clean and sanitize all surfaces, including walls, doors, partitions, door/window jambs,
<br /> vents, light fixtures, ceilings, etc. Tile floors and walls shall be cleaned and polished.
<br /> 3.1.10 Clean, sanitize interior and exterior of washbasins and around all fixtures to remove
<br /> mineral deposits, water spots, dirt, grim, and any other unclean condition. Polish all metal
<br /> fixtures surfaces, inside and out, including but not limited to toilets, urinals, plumbing,
<br /> sinks, flush valves, mounting plates, dispensers, nuts, screws, traps, hose bibs, water
<br /> connections, handrails, mirrors, etc. using approved products.
<br /> 3.1.11 Clean and disinfect benches using approved germicidal cleanser.
<br /> 3.1.12 Clean and disinfect lockers (inside, outside and tops) using approved germicidal cleanser.
<br /> Throw away any trash found in unlocked lockers or on top of lockers.
<br /> 3.1.13 Clean and sanitize shower walls,fixtures and curtains using approved germicidal cleanser.
<br /> 3.1.14 Pick-up, clean, sanitizes and removes trash and debris, including but not limited to feces,
<br /> urine, paper, within 25' feet of the building in each direction.
<br /> 3.1.15 Clean exterior of the building/roof free of all stains, dirt, grime, sand, or other foreign
<br /> materials including paper wads, confetti, tape, slap tags, cob webs, dust, etc. within 25' of
<br /> the building.
<br /> 3.1.16 Turn off lights once work is completed. And/or close or open restrooms per city staff
<br /> direction.
<br /> 3.1.17 Clean and polish exterior of the building amenities (attached) including but not limited to
<br /> drinking fountains, lights, Knox boxes, plaques, windows, etc. of dirt, grime, all foreign
<br /> materials including paper wads, confetti, tape, slap tags, cob webs, dust, etc.
<br /> 3.1.18 1st Cleaning, Pressure wash all exterior wall and pavement surfaces to remove dirt, dust,
<br /> debris, stains, etc. to within 25' of the building.
<br /> 3.1.19 Pressure equipment will be gas operated
<br /> City of Santa Ana RFP 25-043 Page 22 of 44
<br />
|