Laserfiche WebLink
EXHIBIT A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 2.-6990 BRISTOL STREET RLHABILIT.AT10. <br />I -ROM SA%1 A CLARA AVL I U %ILMORY LANE <br />BID PROPOSAL <br />TO. CIT)' ('OL'\C11. OF THE Cl I OF SAM A A\A <br />FROM. K.1 NOULCONIPANY <br />REQUIREMENT <br />1'he undersigned bidder declares that the haw carefull} examined the iocation 4 the proposed <br />%ork, that theN hale examined the Contract Documents in its entiret% and hmhr prupows to <br />furnish all material and do all the %ork required to complete the said %orl, in accordance ►%ith said <br />plans (if an% I and the specifications for the unit pricetsi or lump sumts) set forth in the IolloNing <br />schedule: <br />Item <br />Description <br />Qh <br />I. nit <br />Unit Price <br />amount <br />I <br />Lnclassified Excasation <br />! 370 <br />0 <br />S _I().'M <br />S 77,700.00 <br />2 <br />Cold Mill W)' <br />1;;.000 <br />SF <br />S 1.17 <br />5 181,350.00 <br />3 <br />4 <br />AC Pa%cmcnt` <br />Asphalt Rubber Hot Mix IARH%1)' <br />I <br />I <br />2010 <br />r\ <br />1 <br />S 140.00 <br />S 169.00 <br />S 24.000.00 <br />S 338,000.00 <br />5 <br />6 <br />PCC Sidewalk (4.) <br />1 PCC Dri%c%%a% Approach <br />3.700 <br />200 <br />SF <br />SF i <br />S U 5 <br />S 23.00 <br />S 32,375.00 <br />S 4,600.00 <br />7 <br />1 PCC Curb Ramp <br />2.000 <br />SF j S 16.00 <br />S 32,000.00 <br />8 <br />PCC Curb and Guacr tT,-pc A-2-8► <br />'_;it <br />LF <br />S 41.00 <br />S 10.250.00 <br />9 <br />PCC Cross-Gutter(Anerial1 <br />260 <br />SF <br />S 23.00 <br />S 5,980.00 <br />10 <br />i PCC Bus Pad <br />4.000 <br />SF <br />S 22.00 <br />S 88,000.00 <br />11 <br />Root Sha4e• <br />! 3 <br />F=A <br />S 400.00 <br />S 1,200.00 <br />Adjust %k ater Vake Frame and <br />Corer to 1: inished Grade <br />12 <br />FA <br />S 1,800.00 <br />S 21,600.00 <br />13 <br />Adjust %% ater "Meter Framr and <br />Co%er to Finished Grade <br />� <br />I <br />1 A <br />S 1,320.00 <br />S 2,b40.00 <br />_ <br />14 <br />Adjust Manhole Frame and Ci)%cr <br />1 `. 9 EA <br />S 1,700.0i) <br />S 15,300.00 <br />P-1 of P-19 <br />