Laserfiche WebLink
TSCM CORPORATION <br /> ` R ` O R AT I + N 714.8 Jamestown Lane <br /> (`Jl I�7 r`Jl Huntington Beach,CA 92647 <br /> 714.841.1988 <br /> An Environmental! Sensitive Service Corporation www.t1.me fax <br /> y P www.tscrncorp.coan <br /> Contractors License#934760 <br /> SCOPE OF SERVICES & SCHEDULE <br /> A. Power Sweeping <br /> 1. Contractor shall supply all labor, materials, equipment, and transportation necessary for the <br /> removal of trash, dust, and debris from parking lots, vehicular entryways, bus parking stalls, and all <br /> four levels of parking structure as indicated on the attached map (Exhibit A) of the Santa Ana <br /> Regional Transportation Center (SARTC). <br /> 2. Contactor is required to sweep all designated areas following frequencies on attached sheet. All <br /> work at the SARTC to be done between the hours of 11 pm and 4am. <br /> 3. Contractor must leave the area clean and free of all trash, dust and debris. The Contractor must <br /> remove all of the trash dust and debris from the facility. The sweeping process must not damage <br /> any surfaces. The sweeping process must not damage adjacent areas in any way. The contractor <br /> will be responsible for all damage to the surrounding areas. <br /> 4. The contractor, upon completion of the job and prior to final acceptance, shall remove all supplies, <br /> materials, debris, rubbish, etc., caused by the operation and leave the finished site in a neat, orderly <br /> condition. <br /> 5. Sweeping must include area under and around vehicles parked in 4ots or in parking structure; in or <br /> around all corners and recesses and other structures located within the sweeping area. <br /> 6. All curbs adjacent to the SARTC property must be swept, removing all dirt and grime. <br /> 7. The Contractor will be responsible for the disposal of all waste. <br /> B. Power Washing <br /> 1. Contractor shall supply all labor, materials, equipment, and transportation necessary for the <br /> removal of stains and deposits from cement and brick paver sidewalks as indicated on the attached <br /> site plan (Exhibit A) of the SARTC. <br /> 2. All work at the SARTC shall be performed seven days a week between the hours of 11 pm and <br /> 4am. <br /> 3. The areas are described on the next page <br />