Laserfiche WebLink
Exhibit D: Proposed Structure Improvements("Work Plan") <br /> 2301 North Westwood Avenue <br /> Item Year Improvement <br /> 1 2025 Replace one rear vinyl slider window with new window that is compatible in <br /> materials, design, and operation. Planning Division staff approval required prior to <br /> issuance of Building permit. <br /> 2 2025 Trim exterior landscaping to expose and accentuate historic property features,such <br /> as the high gable roofline and corner/ribbon windows,to ensure a clear view of the <br /> primary(west and south)fagades from the public right-of-way. <br /> 3 2025 Repaint exterior of residence with a historically-compatible color palette. <br /> 4 2026 Remove double security doors from the main entrance. Replacement doors require <br /> Planning Division staff approval prior to installment. <br /> 5 2027 Change out exterior lighting for historically-appropriate lighting. Planning Division <br /> staff approval required prior to installation. <br /> 6 2028 Remove and replace the double glass block window (south fagade) with a period <br /> appropriate window that is compatible in materials,design,and operation.Planning <br /> Division staff approval required prior to issuance of Building permit. <br /> 7 2030 Replace non-original garage door with historically-compatible garage door, <br /> approved by Planning Division staff prior to installation. <br />