Laserfiche WebLink
Project Timeline <br /> THRIVE Santa Ana <br /> Arts Grant <br /> March - December 2025 <br /> *Input your information directly onto this form and upload onto Submittahle.com. <br /> DATE ACTION OUTCOME <br /> August Community Consultation Meeting: Brainstorm . 1 Community Consultation Meeting w/ <br /> 2025 ideas for mural with La Colmena Operators documentation (notes, photos) <br /> and community members <br /> • 1 Draft Mural Design <br /> Artist Alicia Siu to gather Operators and • 1 Final Mural Design <br /> community input, to create preliminary mural • 1 Mural Artist Contract <br /> design <br /> THRIVE, community and Operators to provide <br /> 1-time feedback; Artist Alicia Siu to update <br /> and finalize mural design <br /> Sept-Oct Mural Painting: Alicia Siu to paint on 15 ft x 50 ft (750 SF) mural <br /> 2025 specialized canvas material, an approximately <br /> 15 ft x 50 ft mural, at her studio, per agreed <br /> upon design. She will provide updates <br /> regarding progress, and work with THRIVE to <br /> address any questions or concerns. <br /> Nov 2025 Mural Installation: • 1-3 contracted jobs for wall prep and <br /> • Contract installation team mural installation <br /> • Prepare wall, potentially plaster to create • Documentation of installation (photos) <br /> flat even surface • Installed 15 ft x 50 ft (750 SF) mural with <br /> • Rent lift and install painted canvas using community significant imagery <br /> mural gel and specialized equipment • Public event: mural unveiling celebration <br /> • Coat mural with color shield and graffiti w/documentation (photos, video and <br /> protection audio) <br /> Mural unveiling celebration <br /> Dec 2025 Grant closeout and final report Submit Final Report <br />