My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Trash, Weeds, Rubbish, Sanitation Abatement, and Board-Up Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025
>
Item 11 - Trash, Weeds, Rubbish, Sanitation Abatement, and Board-Up Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 4:09:51 PM
Creation date
7/30/2025 4:08:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
11
Date
8/5/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> 5) 1/2" (USS Standard) Flat washers with an inside diameter large enough to bypass the <br /> wrench neck inside the carriage bolt head so no lift edge is available beneath an installed <br /> carriage bolt head. <br /> 6) 3/8" (USS Standard) diameter flat washers for installation beneath the nut inside the building <br /> 7) Combination of 2"-3" deck nails and 2"-3" Star-drive screws; T-20, T-25, etc. <br /> C. Barrier Assembly <br /> 1) Plywood shall be cut to fit over the window and door openings, flush with outside of the <br /> molding/trimmer stud.Application of barriers shall be completed so that all lift or pry points <br /> are avoided. Plywood board shall be solid sheets without seams or joints. <br /> 2) The 2x4 braces shall be cut to fit the horizontal dimension of the plywood. Two exterior <br /> and two interior 2x4 braces shall be provided for each window and three sets for each <br /> door. <br /> 3) Window Assembly — Braces are located horizontally approximately 1/3 of the distance <br /> from the top and the bottom of the window. Bolt holes are located 1/3 of the length of the <br /> brace from the outside edge of the windowjams. Prior to installation, the assembly should <br /> be pre-assembled and 3/8" holes drilled through all of the components. <br /> 4) Door Assembly—Door braces will be placed horizontally; one in the center of the doorway <br /> and one 1/2 the distance from the center to the top and one 1/2 distance from the center <br /> to the bottom of the doorway. Bolt holes are located 1/3 of the length of the brace from <br /> the outside edge of the doorframe. Prior to installation, the assembly should be pre- <br /> assembled and 3/8" holes drilled through all of the components. <br /> 5) Plywood used to cover exterior openings shall be nailed every 12" along the perimeter of <br /> the frame of the window, door, or opening. <br /> 6) The 2x4 braces on the interior and exterior of the assemblies shall be secured using 3/8" <br /> by 12" carriage bolt assemblies. Bolts shall be inserted through the predrilled holes from <br /> the exterior with a 1/2" washer place against the exterior brace, a 3/8" washer is placed <br /> against the interior brace. The bolt is tightened from the inside so that it slightly <br /> compresses the interior brace. The 2x4 Bottom Brace shall be cut to width of door trim <br /> and drilled to the floor to prevent opening. <br /> 7) Garage Door—the opening shall be covered with plywood and secured with a minimum <br /> of 3- inch-long deck or wood screws installed on 6-inch centers around the circumference <br /> of the opening. An interior or exterior 2x4 Bottom Brace is required to prevent it from <br /> opening and drilled to the floor with masonry screws (or as appropriate). <br /> NOTE: These specifications are subject to change upon case-by-case scenario. Any <br /> changes or recommendations shall be discussed during the walk-through of the <br /> property prior to a proposal, quote and or notice to proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.