My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />18345 Pasadena Street, Lake Elsinore, CA 92530 <br />Ph: 714-571-0175 Fax: 714-558-0404 <br />www.consultnserve.com <br />SECTION 1 <br /> <br />COST PROPOSAL <br /> <br />RATE AND SERVICE STRUCTURE- Fee Structure (Flat rate and hourly rate) for the following services: <br />1. Board-up cost of 1st standard window/ (1) each additional window thereafter $175 1st window, $125 each additional <br /> <br />2. Board up cost of 1st single door opening /(1) each additional door thereafter $175 1st window, $125 each additional <br /> <br />3. Board up cost of a garage $450 <br /> <br />4. Bolt, screw door, garages and windows $25 <br /> <br />5. Chain and lock fee $50 <br /> <br />6. Weed abatement service: includes mow, hand weed abatement, blow off sidewalks, edging and handwork of <br />perimeter, disposal etc., (primarily neglected residential, commercial property) per hour rate $60/hr <br /> <br />7. Small scale- Debris removal service; cost per ton. Includes clean-up debris by hand, disposal (no heavy equipment) <br />$250/ton <br />8. Large Scale - Debris removal service cost, unpermitted encampments. Cost of heavy equipment that include but may <br />not be limited to Track Loaders, Truck and semi-end dump trailer combinations, Water trucks, High Reach fork-lifts, <br />Stake bed trucks, backhoes, skip loaders, tractors, and additional service trucks and machinery to assist. Evaluation and <br />analysis will be based on submittal of proposal and all identified costs, including any and all costs related to collect and <br />dispose items. Varies based on Equipment Needed. <br /> <br />9. Travel charge $200 <br /> <br />10. After hour charge Rates listed in Section 2 <br /> <br /> <br /> <br /> <br /> <br />SECTION 2 <br /> <br /> <br />City Council 11 – 45 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.