My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-08-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
08/05/2025 Regular
>
Agenda Packet_2025-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 5:11:00 PM
Creation date
7/30/2025 5:07:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/5/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A Scope of Work – Graviton Consultant Agreement <br /> 31 <br />4.2 Business Process Track <br />The activities included in the business process track will define the City’s future state business processes, <br />providing the foundation upon which the CEMLI, change management, training, and project <br />management track implementation tasks are planned and executed. The business process track will <br />establish the scope of business processes to be implemented. Those business processes will be <br />configured, analyzed, and updated repeatedly through iterative formal review cycles. Multiple cycles of <br />testing will be conducted where validation of the business processes serves as the acceptance criteria <br />for the system. For Phase 2 ERP the business process track includes eight deliverables spanning the five <br />Graviton implementation stages as depicted in the graphic below. For Phase 1 HCM, Payroll Validation <br />Test serves as the ninth business process track deliverable. <br />Graphic: Business Process Track Deliverables <br /> <br />The success of implementation will be measured by how effective the City transitions to the best <br />practice business processes that are native to the Oracle Cloud applications. The steps required to <br />complete this transition are at the core of the business process track. <br />4.2.1 Conference Room Pilots <br />Included in the business process track are three Conference Room Pilots. The Conference Room Pilot <br />deliverables will be critically important in determining how the Oracle Cloud modules will be configured <br />to meet the City’s requirements and how the City’s future state business processes will be updated. For <br />each Conference Room Pilot the project team will conduct a series of work sessions to review City use <br />cases and business processes identified during the plan and design stages. The Conference Room Pilot <br />environment will be seeded with configuration and development assigned to the corresponding CEMLI <br />Cycles. City and Graviton project team members will exercise the Oracle Cloud modules by unit testing <br />the inventory of planned use cases and business processes. From the Cloud Business Process <br />Familiarization deliverable through completion of the third Conference Room Pilot, the project team will <br />continuously revise and test use cases, business processes, and CEMLIs. At the conclusion of each <br />Conference Room Pilot, use cases and business processes will be updated to reflect City feedback and <br />decisions. Subsequent Conference Room Pilots will be planned and the required CEMLI additions and <br />updates identified. <br /> <br />Graphic: Conference Room Pilots <br /> <br /> <br />City Council 16 – 48 8/5/2025
The URL can be used to link to this page
Your browser does not support the video tag.