Laserfiche WebLink
CITY OF SANTA ANA <br /> <br /> <br /> <br /> <br /> <br /> <br />H. Door Assembly <br /> <br />MATERIALS REQUIRED PER DOOR <br /> 1 - 1/2" CDX PLYWOOD SHEET - CUT TO DIMENSIONS OF DOOR FRAME (WEATHER SIDE) <br /> 1 - 1/2" CDX PLYWOOD SHEET - CUT TO OUTSIDE DIMENSIONS OF DOOR FRAME TRIM <br />(INSIDE) <br /> 6 – 2X4 BRACES - 3 CUT TO WIDTH OF OUTSIDE PLYWOOD <br />- 3 CUT TO WIDTH OF INSIDE PLYWOOD <br /> 1 - 2X4 BOTTOM BRACE - CUT TO WIDTH OF DOOR TRIM DRILLED TO FLOOR (INSIDE) <br /> 6 - CARRIAGE BOLT ASSEMBLIES <br /> <br />NUMBER OF DOORS TO BE SECURED (ND): <br />NUMBER OF DOOR BRACES REQUIRED: (ND X 6) <br />NUMBER OF BOTTOM BRACES REQUIRED: (ND) <br />CARRIAGE BOLT ASSEMBLIES REQUIRED (BD): (ND X 6) <br /> <br /> <br />I. Carriage Bolt Assembly <br /> <br />MATERIALS REQUIRED PER CARRIAGE BOLT ASSEMBLY <br /> 1 - 3/8" X 12' (OR LONGER IF NECESSARY) CARRIAGE BOLT - COURSE THREAD <br /> 1 - 1/2" USS STANDARD FLAT WASHER (WEATHER SIDE) <br /> 1 - 3/8" USS STANDARD FLAT WASHER (INSIDE) <br /> 1 - 3/8" CONSTRUCTION GRADE NUT - COURSE THREAD <br /> <br />TOTAL CARRIAGE BOLT ASSEMBLIES REQUIRED FOR WINDOWS AND DOORS: <br /> <br />(BW + BD) _________________ <br /> <br /> <br />J. Removal of Trash and Debris <br />1) The Contractor shall be responsible for the removal and proper disposal of all trash, debris, and <br />waste materials generated during the demolition of any structure under this Agreement. This <br />includes, but is not limited to, construction materials, rubble, hazardous waste, and any other by- <br />products of the demolition process. <br />2) All trash and trash and debris must be removed from the site within seven (7) days following the <br />completion of demolition activities. The Contractor shall ensure the site is left in a clean and <br />orderly condition, free of any remaining debris. <br />  <br />  <br />City Council 11 – 19 8/5/2025