Laserfiche WebLink
(9) CITY OF SANTA ANA <br /> H. Door Assembly <br /> MATERIALS REQUIRED PER DOOR <br /> • 1 - 112" CDX PLYWOOD SHEET-CUT TO DIMENSIONS OF DOOR FRAME (WEATHER SIDE) <br /> • 1 - 112" CDX PLYWOOD SHEET-CUT TO OUTSIDE DIMENSIONS OF DOOR FRAME TRIM <br /> (INSIDE) <br /> • 6-2X4 BRACES -3 CUT TO WIDTH OF OUTSIDE PLYWOOD <br /> -3 CUT TO WIDTH OF INSIDE PLYWOOD <br /> • 1 -2X4 BOTTOM BRACE-CUT TO WIDTH OF DOOR TRIM DRILLED TO FLOOR (INSIDE) <br /> • 6-CARRIAGE BOLT ASSEMBLIES <br /> NUMBER OF DOORS TO BE SECURED (ND): <br /> NUMBER OF DOOR BRACES REQUIRED: (No X 6) <br /> NUMBER OF BOTTOM BRACES REQUIRED: (ND) <br /> CARRIAGE BOLT ASSEMBLIES REQUIRED (Bp): (No X 6) <br /> I. Carriage Bolt Assembly <br /> MATERIALS REQUIRED PER CARRIAGE BOLT ASSEMBLY <br /> • 1 - 318" X 12' (OR LONGER IF NECESSARY) CARRIAGE BOLT-COURSE THREAD <br /> • 1 - 112" USS STANDARD FLAT WASHER (WEATHER SIDE) <br /> • 1 -318" USS STANDARD FLAT WASHER (INSIDE) <br /> • 1 - 318" CONSTRUCTION GRADE NUT-COURSE THREAD <br /> TOTAL CARRIAGE BOLT ASSEMBLIES REQUIRED FOR WINDOWS AND DOORS: <br /> (BW+ BD) <br /> J. Removal of Trash and Debris <br /> 1) The Contractor shall be responsible for the removal and proper disposal of all trash, debris, and <br /> waste materials generated during the demolition of any structure under this Agreement. This <br /> includes, but is not limited to, construction materials, rubble, hazardous waste, and any other by- <br /> products of the demolition process. <br /> 2) All trash and trash and debris must be removed from the site within seven (7) days following the <br /> completion of demolition activities. The Contractor shall ensure the site is left in a clean and <br /> orderly condition, free of any remaining debris. <br />