My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REAL ESTATE CONSULTING & SERVICES, INC. (2)
Clerk
>
Contracts / Agreements
>
R
>
REAL ESTATE CONSULTING & SERVICES, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 3:27:53 PM
Creation date
8/11/2025 3:27:07 PM
Metadata
Fields
Template:
Contracts
Company Name
REAL ESTATE CONSULTING & SERVICES, INC.
Contract #
A-2025-124-02
Agency
Planning & Building
Council Approval Date
8/5/2025
Expiration Date
8/4/2028
Insurance Exp Date
12/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) CITY OF SANTA ANA <br /> H. Door Assembly <br /> MATERIALS REQUIRED PER DOOR <br /> • 1 - 112" CDX PLYWOOD SHEET-CUT TO DIMENSIONS OF DOOR FRAME (WEATHER SIDE) <br /> • 1 - 112" CDX PLYWOOD SHEET-CUT TO OUTSIDE DIMENSIONS OF DOOR FRAME TRIM <br /> (INSIDE) <br /> • 6-2X4 BRACES -3 CUT TO WIDTH OF OUTSIDE PLYWOOD <br /> -3 CUT TO WIDTH OF INSIDE PLYWOOD <br /> • 1 -2X4 BOTTOM BRACE-CUT TO WIDTH OF DOOR TRIM DRILLED TO FLOOR (INSIDE) <br /> • 6-CARRIAGE BOLT ASSEMBLIES <br /> NUMBER OF DOORS TO BE SECURED (ND): <br /> NUMBER OF DOOR BRACES REQUIRED: (No X 6) <br /> NUMBER OF BOTTOM BRACES REQUIRED: (ND) <br /> CARRIAGE BOLT ASSEMBLIES REQUIRED (Bp): (No X 6) <br /> I. Carriage Bolt Assembly <br /> MATERIALS REQUIRED PER CARRIAGE BOLT ASSEMBLY <br /> • 1 - 318" X 12' (OR LONGER IF NECESSARY) CARRIAGE BOLT-COURSE THREAD <br /> • 1 - 112" USS STANDARD FLAT WASHER (WEATHER SIDE) <br /> • 1 -318" USS STANDARD FLAT WASHER (INSIDE) <br /> • 1 - 318" CONSTRUCTION GRADE NUT-COURSE THREAD <br /> TOTAL CARRIAGE BOLT ASSEMBLIES REQUIRED FOR WINDOWS AND DOORS: <br /> (BW+ BD) <br /> J. Removal of Trash and Debris <br /> 1) The Contractor shall be responsible for the removal and proper disposal of all trash, debris, and <br /> waste materials generated during the demolition of any structure under this Agreement. This <br /> includes, but is not limited to, construction materials, rubble, hazardous waste, and any other by- <br /> products of the demolition process. <br /> 2) All trash and trash and debris must be removed from the site within seven (7) days following the <br /> completion of demolition activities. The Contractor shall ensure the site is left in a clean and <br /> orderly condition, free of any remaining debris. <br />
The URL can be used to link to this page
Your browser does not support the video tag.