Laserfiche WebLink
ANNUAL MILITARY EQUIPMENT REPORT <br />Page 3 <br />Following the deployment of defined equipment, the incident is reviewed and evaluated regarding the appropriateness of the equipment use. During this reporting period, each deployment of defined equipment was evaluated and the use was found to be appropriate based on the information supervisors had at the time of the deployment. <br />Fiscal Impact During this reporting period, no additional defined equipment was purchased. The vehicles have on-going maintenance costs, which are detailed in the below equipment inventory section. Additionally, weapons platforms generally only require annual inspection to ensure they are operationally ready for deployment. The annual maintenance cost for weapon systems are worst case scenario annual estimates, should a weapon platform require repair. However, typically weapons platforms do not require repair and simple routine maintenance and cleaning. In the event a piece of defined equipment requires repair, the funds are drawn from the Police Department’s annual budget allocation. <br />Equipment Inventory <br />VEHICLES <br /> <br />Type Quantity <br /> <br /> Annual Maintenance Cost <br />Mobile Command Vehicle 1 $ 5,500.00 <br />Armored Rescue Vehicle 2 $ 12,600.00 <br />SPECIALTY TACTICAL EQUIP. <br /> <br />Long Range Acoustic Device 2 $ 300.00 <br />Tactical Robot 1 $ 500.00 <br />LESS-LETHAL DEVICES <br /> <br />40mm Launchers 85 $ 4,250.00 <br />40mm Exact Impact Munitions 750 $ - <br />40mm Direct Impact CS Foam 96 $ - <br />Spede-Heat 40mm CS 56 $ - <br />40mm Powder CS Ferrett 60 $ - <br />40mm CS Muzzle Blast 52 $ - <br />40mm CS SKAT Shell 56 $ - <br />12 Gauge Bean Bag Round 650 $ - <br />PepperBall Launcher 2 $ 100.00