My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIRST TRADE, LLC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
FIRST TRADE, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2026 11:29:52 AM
Creation date
8/28/2025 3:23:58 PM
Metadata
Fields
Template:
Contracts
Company Name
FIRST TRADE, LLC.
Contract #
P25-9013
Agency
Public Works
Expiration Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 19 2026 <br /> r <br /> .- CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 25-9013 Housing Authority Tenant Improvement and Change Order Number 2 <br /> ADA Restroorn Renovation <br /> To First Trade LLC dba YMC Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract, <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER, <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. CO#2.1 (COR#2)—Furniture Removal <br /> This change order item addresses cost incurred by the Contractor for the furniture removal of large, j <br /> bulky furniture- City staff determined that said furniture would not be required in the new office layout <br /> and removal benefits access for improvements under this project and future Installations. <br /> AGREED PRICE: $1,446.30 <br /> 2. CO#2.2 (COR#4)—Roller Shade Installation <br /> This change order item addresses cost incurred by the contractor for the removal of existing blinds <br /> to provide new roller shades, as well as to account for a cast variance in the roller shade material <br /> that exceeded the City's estimate for provision of now roller shades. <br /> AGREED PRICE: $3,919.04 <br /> i <br /> 3. CO#2,3 (COR#5)—Microwave Cabinet Relocation <br /> This change order item addresses cost incurred by the contractor for the relocation of the microwave <br /> cabinet in the breakroom. The existing location of the microwave limits functionality, as it would not <br /> be accessible when the sink is in use, as well as there being safety concerns when the microwave is <br /> operated in this location. <br /> AGREED PRICE: $3,038.94 <br /> 4. CO#2.4(COR#6)—Restroom Access Panel Relocation <br /> This change order item addresses cost incurred by the contractor for the relocation of access panels. <br /> This work includes framing, extending plumbing and adding isolation valves at the new access panel <br /> locations, which sit closer to the floor to improve access for future maintenance work. <br /> AGREED PRICE: $3,961.44 <br /> TOTAL AGREED CHANGE ORDER= 1 2 365.72 <br /> Page 4 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.