My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 4.28.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 4.28.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:47:35 AM
Creation date
9/2/2025 9:43:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Training and FAQ’s <br />Full Shop Meetings: <br />●Monthly meetings in which all shop personnel are required to <br />attend. Discuss traffic plans and new commitments in detail. <br />Pre-Shift Huddles: <br />●Before each shift (morning, noon, night) the crew goes over <br />updates, important communication, issues, and ensures <br />strategy is set for the shift <br />Promotional Days / Major Holidays / Sticker Days: <br />●Dutch will determine if needed and hire a Third-Party Traffic <br />Control Company to come in when the Stacking could possibly <br />be an issue. <br />Evolving Traffic Plan: <br />●The Grand Opening plan will be utilized whenever necessary <br />to mitigate traffic congestion that may occur from our new <br />shop opening. We reserve the right to adjust the plan as <br />conditions dictate, and expect that after the initial community <br />response, our traffic patterns will settle to a predictable level <br />within the first 90 days of operation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.