Laserfiche WebLink
503.07'CHICK-FIL-APARKING <br />17th STREET <br />PARKING <br />SIDEWALKMANIFOLDSIDEWALK <br />LVAPOR <br />EXTRACTION <br />SYSTEM <br />CARBON VESSELS <br />SIDEW <br />ALKSIDEWALK <br />SEVEN ELEVEN PONDEROSA STREETNORTH TUSTIN <br /> AVENUECHAIN <br /> L <br />INK <br /> FENCE <br /> WITH <br /> GATECLPLC <br />LP <br />LPLPLP <br />SIDEW <br />ALKSIDEWALK <br />SIDEWALKCOMMERCIAL PROPERTY <br />TUTTO FRESCO <br />PARKING <br />PLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERPLANTERIN ‘N’ OUT <br />PLANTE <br />R <br />WALL <br />CHAIN LINK FENCE <br />CHAIN LINK FENCE <br />VE1d <br />839 S. Beacon Street #1967, San Pedro, <br />California 90733 <br />(310) 505-3675, FAX (310) 997-3481 <br />S HAR P EN VIR ONMENTAL <br />TECHNOLOGIES, INC. <br />FIGURE 2 <br />Site Plan with Groundwater <br />Monitoring and Injection Wells <br />1701, 1809 & 1819 North Tustin Avenue <br />Santa Ana, California 92705 <br />Approximate Scale in Feet: 1”=60’ <br />0 60’120’ <br />Project No.: 21-918 <br />Date: 10/13/23 <br />0 1”2”Drawn by: st <br />Reviewed by: gb/jes <br />N SHARP <br />ENVIRONMENTAL <br />TECHNOLOGIES, iNC. <br />VE2 d&s <br />MW10 <br />MW5 <br />MW4 <br />MW8 <br />MW1 <br />MW2 <br />MW3 <br />MW6 <br />VPs-1 <br />IW5 <br />VE8 d,m & s <br />VE7s,m&d <br />VE2 m <br />VE6 d,m&s <br />VE3 s <br />VE4 d <br />VE4 m&s <br />VE5 m <br />VE5 d&s <br />IW3 <br />IW1 <br />IW2 <br />IW9 <br />IW4 <br />IW6 <br />IW8 <br />IW10 <br />IW7 <br />VE1m&s <br />VPd-5 <br />VPd-3 <br />VPd-1 <br />VPs-5 <br />VPs-2 <br />VPs-6 <br />VPd-4 <br />VPs-3 VPd-2 <br />VPs-4 <br />VPs-6 <br />MW10 <br />SOIL VAPOR PROBE (SHALLOW [s] AND DEEP [d]) <br />IW10 <br />VE6 d,m&s <br />GROUNDWATER INJECTION WELL <br />CENTER LINE <br />PROPERTY LINE <br />UNDERGROUND SOIL INJECTION PIPING <br />LEGEND: <br />SOIL VAPOR EXTRACTION WELL (SHALLOW, MEDIUM, DEEP) <br />GROUNDWATER MONITORING WELL <br />PROPOSED SOIL BORING FOR ISCO BENCH TEST <br />PROPOSED GROUNDWATER MONITORING WELL MW9 <br />PROPOSED GROUNDWATER INJECTION WELL IW11 <br />UNDERGROUND SOIL VAPOR EXTRACTION PIPING <br />VE3 m&d <br />8’ Deep <br />5’ Deep 4’ Deep <br />6’ Deep <br />7’ Deep <br />3’ Deep <br />Proposed ISCO <br />Soil Boring <br />Location <br />3” Ø Concrete Irrigation pipe (3’ BGS)` <br />Electrical <br />Box <br />Electrical Conduit (2-4’ BGS) <br />A <br />A’ <br />B B’ <br />C C’ <br />CROSS SECTION LINE (DETAIL ON FIGURES 3 AND 4) <br />MW7 <br />MW9 <br />IW11 <br />