Laserfiche WebLink
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE: <br />Civic Center Rehab: Minter to <br />San￿ago <br />PROJECT DESCRIPTION:PROJECT NEED: <br />Replacement ofexis￿ng asphalt ￿undabout inte￿ection pavement <br />￿th Po￿land cement concrete pavement and AC pavement <br />rehab￿itation along Ci￿c Center D￿ve between M￿ter St￿et and <br />Santiago St￿e￿. <br />￿is ￿egment of￿adway has been iden￿￿ed a￿ a high p￿o￿ty by the <br />City's Pavement Management System. ￿e pavement is dete￿orating <br />due to ￿e weather, age, and heavy usage. Some of the adjacent <br />cu￿s￿ gu￿ers￿ d￿ve￿y app￿aches￿ curb ramps, and sidewalks are <br />also in va￿ou￿ state￿ of￿srepair and ￿qui￿ replacement.PROJECT CATEGORY: <br />Street Imp￿ve￿ents <br />A￿erial Street Rehab￿ta￿on <br />LOCATION MAP <br />\ <br />\PROJECT COSTS <br />Engineering <br />FY 25/26 <br />742,000 <br />742,000 <br />FY 26/27 <br />FY 26/27 <br />FY 27/28 <br />FY 27/28 <br />FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />\\￿, <br />TOTAL <br />￿. <br />SOURCE OF FUNDS <br />GENERAL FUND <br />RMRASB1 <br />FY 25/26\\ <br />742,000 <br />TOTAL 742,000 <br />￿ <br />￿￿￿ <br />￿ <br />AGENCY: <br />Public ￿￿ <br />DIVISION: <br />GIP Enginee￿ng <br />CONTACT: <br />Ma￿ Canta, Senior Civ￿ ￿gineer <br />DATE: <br />17-Apr-2025 <br />18