My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 5.12.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 5.12.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:50:58 AM
Creation date
9/2/2025 9:48:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT <br />WORKSHEET <br />PROJECT TITLE: <br />High Visibty ed Csswalk <br />Improvmnts <br />PROJECT DESCRIPTION:PROJECT NEED: <br />Insta high sib marked csswalk on 1st Stet between <br />Downtown Plaza and Euclid Street, on Bristol Stet from Rivelen <br />Lane to Wts Avenue, and Badway/ashington Avenue and <br />Main Se17th Street Inteections. <br />ect is designed to pve c safety for a use at key <br />inteections in the Ci <br />PROJECT CATEGORY: <br />c Impmnts <br />c Impmnts <br />LOCATION MAP <br />PROJECT COSTS <br />Construction <br />FY 25/26 <br />301,193 <br />301,193 <br />FY 26/27 <br />FY 26/27 <br />FY 27/28 <br />FY 27/28 <br />FY 28/29 <br />FY 28/29 <br />FY 29/30 <br />FY 29/30 <br />FY 30/31 <br />FY 30/31 <br />FY 31/32 <br />FY 31/32 <br />TOTAL <br />CITIDE SOURCE OF FUNDS <br />HSIP <br />FY 25/26 <br />273,812 <br />27,381M2 LOCAL FAIRSHARE <br />TOTAL 301,193 <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public c gineeng Ruben Castaneda, Senior Engineer 17-Apr-2025 <br />40
The URL can be used to link to this page
Your browser does not support the video tag.