My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet 7.14.25
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2025
>
Packet 7.14.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 9:58:44 AM
Creation date
9/2/2025 9:57:08 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning and Building Agency <br />Item # 1 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Planning Commission Staff Report <br />July 14, 2025 <br />Topic: CUP No. 2025-15 – Anchor Stone Christian Church (2938 S. Daimler Street) <br />RECOMMENDED ACTION <br />Adopt a resolution approving Conditional Use Permit No. 2025-15, as conditioned. <br />EXECUTIVE SUMMARY <br />Steven Lee, representing Anchor Stone Christian Church (“Applicant” and “Property <br />Owner”), is requesting approval of Conditional Use Permit (CUP) No. 2025-15 to allow <br />the operation of a church located at 2938 S. Daimler Street (“Project”). The property is <br />located within the Professional (P) zoning district and has a General Plan Land Use <br />Designation of Industrial/Flex-Medium (Flex-3). Pursuant to Section 41-313.5(n) of the <br />Santa Ana Municipal Code (SAMC), churches located in the P zoning district require <br />approval of a CUP. Staff is recommending approval of the Applicant’s request due to the <br />facility’s location, proposed operations, and compatibility with surrounding land uses. <br />DISCUSSION <br />Project Description <br />The proposed church is located within a 5.43-acre site that contains an office complex <br />with eighteen (18) buildings. The site is generally bounded by Deere Avenue to the east, <br />Garry Avenue to the south, Pullman Street to the west, and Daimler Street to the north. <br />The church is proposing to occupy a 3,843-square-foot unit that is part of an existing <br />8,250-square-foot building. The Applicant proposes to occupy the aforementioned unit for <br />worship services, religious education, and video production. Additionally, the Applicant <br />proposes to have summer bible school for one week during the summer. The proposed <br />floor plan includes a lobby, social hall, auditorium, restrooms, meeting rooms, a nursery <br />to be used during worship services, and storage rooms. The proposed hours of operation <br />for the administrative offices would be Monday to Friday from 9:00 a.m. to 5:00 p.m. and <br />Saturday from 10:00 a.m. to 7:00 p.m. The proposed church/congregation services will <br />be held Sundays and during holidays from 9:00 a.m. to 10:00 p.m. <br />The proposed interior tenant improvements include demolition of nonbearing walls and <br />construction of new interior partitions, construction of a stage for the proposed auditorium, <br />upgrades to the electrical wiring, new plumbing fixtures, new mechanical equipment, and <br />fire sprinklers. There are no exterior changes proposed with the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.