My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 6.18.25
Clerk
>
Agenda Packets / Staff Reports
>
Zoning Administrator (2009-Present)
>
2025
>
Agenda Packet 6.18.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 2:56:43 PM
Creation date
9/2/2025 2:55:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Resolution No. 2025-XXX <br />Page 8 of 9 <br /> <br />6. Contact information for an onsite manager or other individual responsible <br />for the daily operations during construction shall be posted in a prominent <br />location at the front entry in the event that noise, traffic, and/or parking <br />complaints need reporting. <br /> <br />7. Subject to review and applicability by the Planning and Building Agency, the <br />Community Development Agency, the Public Works Agency, and the City <br />Attorney, to ensure that the property and all improvements located <br />thereupon are properly maintained, Applicant (and the owner of the property <br />upon which the authorized use and/or authorized improvements are located <br />if different from the Applicant) shall execute a Property Management <br />Agreement. The Agreement shall be recorded against the property by the <br />City and shall be in a form reasonably satisfactory to the City Attorney. The <br />executed agreement must be submitted to the Planning Division by the <br />Applicant within 90 days of the approval of this Resolution. The Agreement <br />shall contain covenants, conditions and restrictions relating to the following: <br /> <br />a. Compliance with operational conditions applicable during any <br />period(s) of construction or major repair (e.g., proper screening and <br />securing of the construction site; implementation of proper erosion <br />control, dust control and noise mitigation measure; adherence to <br />approved project phasing etc.); <br /> <br />b. Compliance with ongoing operational conditions, requirements and <br />restrictions, as applicable (including but not limited to hours of <br />operation, security requirements, the proper storage and disposal of <br />trash and debris, enforcement of the parking management plan, <br />and/or restrictions on certain uses; <br /> <br />c. Ongoing compliance with approved design and construction <br />parameters, signage parameters and restrictions as well as <br />landscape designs, as applicable; <br /> <br />d. Ongoing maintenance, repair and upkeep of the property and all <br />improvements located thereupon (including but not limited to controls <br />on the proliferation of trash and debris about the property; the proper <br />and timely removal of graffiti; the timely maintenance, repair and <br />upkeep of damaged, vandalized and/or weathered buildings, <br />structures and/or improvements; the timely maintenance, repair and <br />upkeep of exterior paint, parking striping, lighting and irrigation <br />fixtures, walls and fencing, publicly accessible bathrooms and <br />bathroom fixtures, landscaping and related landscape improvements <br />and the like, as applicable); <br /> <br />e. If Developer and the owner of the property are different (e.g., if the <br />Applicant is a tenant or licensee of the property or a ny portion <br />thereof), both the Applicant and the owner of the property shall be
The URL can be used to link to this page
Your browser does not support the video tag.