My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 6.18.25
Clerk
>
Agenda Packets / Staff Reports
>
Zoning Administrator (2009-Present)
>
2025
>
Agenda Packet 6.18.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 2:56:43 PM
Creation date
9/2/2025 2:55:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Exception Nos. 2025-01 and 2025-02 <br />OCERS Headquarters (1200 N. Tustin Avenue) <br />June 18, 2025 <br />Page 6 <br />5 <br />0 <br />9 <br />4 <br />increase from 35 feet to 43 feet and nine-inches at a new industrial building located at <br />300 and East Dyer Road). <br />Minor Exception No. 2025-02 for Off-Street Parking Reduction <br />Pursuant to Section 41-632(a)(3)(g) of the SAMC, the Planning Manager may grant a <br />minor exception to reduce the number of required off-street parking stalls by no more than <br />twenty percent of the required number of parking stalls. However, since the applicant is <br />also requesting a minor exception for an increase in building height, this matter has been <br />forwarded to the Zoning Administrator to review the project comprehensively and make a <br />determination. In accordance with Section 41-638.1 of the SAMC, minor exceptions from <br />the off-street parking regulations shall be subject to grant or denial based upon the <br />standards set forth in Section 41-638.1 of the SAMC and not upon the standards set forth <br />in section 41-638 of the SAMC. A minor exception for parking may be granted when two <br />or more uses share required parking stalls, provided no conflict will arise between parking <br />for either use due to differences in time of primary utilization of parking. Staff has reviewed <br />the applicant’s request for a reduction in required off-street parking at the subject site and <br />the following analysis warrants staff’s recommendation of approval. <br />The new building will serve as OCERS headquarters for approximately 121 employees <br />but will also provide a board room for OCERS’ board members to host their board <br />meetings. The primary use has been determined by staff to be office and, therefore, <br />parking is set forth by Section 41-1342 of the SAMC, which requires three parking spaces <br />for each 1,000 square feet of gross floor area. Based on this parking ratio, the project <br />requires a total 197 parking spaces. However, this ratio does not consider differences in <br />time of primary uses and secondary uses for which the applicant is seeking approval of <br />ME No. 2025-02. The proposed building features multiple secondary or ancillary uses <br />that will not be in operation simultaneously. This includes the 3,128-square-foot board <br />room with a closed session office and breakroom; interview rooms on the ground floor; <br />multiple training rooms and workshop/collaboration spaces on the second floor; a 1,303- <br />square-foot café; a 2,178-square foot wellness center; and multiple meeting rooms on the <br />third floor. These amenities are also required to accommodate employees needs and <br />involving workplaces. <br />The project proposes 160 parking spaces which is more than sufficient for OCERS’ <br />needs. Of the 160 parking spaces, 107 parking spaces will be allocated to its 121 <br />employees, which include full-time and part-time employees with varying working hours, <br />and 46 parking spaces will be allocated to visitors with varying visiting hours. The project <br />will also provide eight bicycle parking spaces. In addition, the project site is located in a <br />mode-shift friendly environment with transit, bicycling, and walking amenities that facilitate <br />and encourage alternative modes of transportation, further contributing to reduction in <br />parking demand. Two Orange County Transit Authority (OCTA) routes (Route 60 Long <br />Beach – Tustin and Route 71 Yorba Linda – Newport Beach) are within 0.5 miles of the <br />project site. No parking deficiencies or traffic congestion is anticipated from the proposed <br />facility. As part of the development process, the Public Works Agency reviewed the
The URL can be used to link to this page
Your browser does not support the video tag.