Laserfiche WebLink
2 <br />2 <br />3 <br />5 <br />6 <br />Exhibit D: Proposed Structure Improvements (“Work Plan”) <br />424 South Broadway <br />Item Year Improvement <br />1 2024 Exterior paint; traditional Craftsman colors <br />2 2024 Repair all original windows to be fully functional as needed through the following: <br />replace worn/broken window pull ropes, replace broken window panes, repair <br />exterior wood rot, and weatherproof windows. <br />3 2024 New front yard landscaping and walkways in era-appropriate style <br />4 2024 Install rain gutters in appropriate style/material <br />5 2024 Install yard drainage to move rain away from foundation <br />6 2025 Repair siding <br />7 2026 Repair cracks in foundation <br />8 2026 Seismic retrofit of foundation, brace and bolt <br />9 2027 Update electrical systems throughout <br />10 2027 Update plumbing system throughout <br />11 2028 Reroof with synthetic cedar shakes in keeping with traditional Craftsman style <br />12 2032 Termite tenting as preventative maintenance <br />13 2033 Sister existing original foundation walls (with a new wall that is located on the <br />interior of the building adjacent to the original exterior wall) to preserve the <br />building’s structural integrity. <br /> <br />    <br />Historic Resources Commission 40 7/15/2024 <br />