My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MURALCOLORS, INC.
Clerk
>
Contracts / Agreements
>
M
>
MURALCOLORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2025 2:12:19 PM
Creation date
9/5/2025 2:11:54 PM
Metadata
Fields
Template:
Contracts
Company Name
MURALCOLORS, INC.
Contract #
N-2025-223
Agency
Public Works
Expiration Date
8/11/2026
Insurance Exp Date
11/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSERVATION WORK PLAN <br /> A preliminary Conservation Work Plan will be provided to the Client once MuralColors has <br /> completed its Pre-Wall Stabilization Condition Report and Documentation. <br /> PROPOSAL FOR MURAL CONSERVATION - PHASE 1 <br /> Item Amount <br /> MURAL CONSERVATION - DIRECT TREATMENTS PHASE 1 $41,793.00 <br /> • Pre-Wall Stabilization Condition Report and Documentation <br /> • Surface Cleaning and Consolidation <br /> •Wall fissure assessment, reinforcement, and paint film reattachment <br /> • Review top of wall and coordinate with contractor on wall modifications, remove <br /> fencing and treat embedded metal. <br /> •Advise on wall reinforcements <br /> • Provide ACM shallow panel barrier guards and hardware to protect art surface <br /> • Mark deck and walls for cutting; provide oversight during cutting <br /> CONSULTATION AND OVERSIGHT OF CONSTRUCTION REINFORCEMENT OF $6,673.00 <br /> ART WALL <br /> • General Coordination and Consultation with Contractor <br /> •Attend coordination meetings as requested by Client and CM <br /> • Provide oversight during critical art wall activities <br /> •Consult Contractor on cutting mural wall and provide onsite supervision <br /> • Consult Contractor on cutting concrete deck and provide onsite supervision <br /> • Consult Contractor trenching front of mural wall; consult on protective barrier <br /> modifications <br /> • Review Contractor plan and make suggestions for drilling pinning into back of art wall <br /> as detailed in S402 Item 16 <br /> • Be on site for Contractor boring of wall for cell fill. <br /> • Review GC plan for foundations. Be on site for concrete pour of supporting wall <br /> against existing remaining mural wall. <br /> Insurance and Site Requirements $1,473 <br /> TOTAL $49,939.00 <br /> The information contained in this document is confidential,privileged and only faruse by the Client for MuralColors related activities and may not be <br /> used,published or redistributed without the prior written consent of MuralColors.All procedures,treatments,formulas,quantities,and estimates are <br /> proprietary information.Ploase do not distribute without prior authorization from MuralColors-We can be reached at hello@muralcolors.com and <br /> 323-601-5000 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.