Laserfiche WebLink
Scope of Work (Peterson Projex Inc): <br /> 1.Artist Collaboration & Design: <br /> • Santa Ana-based artists will collaborate with Sahuayo-based artists to co-develop the mural <br /> concept and design. <br /> • The final design must reflect elements of both cities' heritage, community, and shared values. <br /> • Artists will participate in virtual and in-person meetings as needed to coordinate the design and <br /> execution plan. <br /> • Final mural design must be approved by relevant city departments before execution. <br /> 2. Site Preparation: <br /> • The Contractor shall be responsible for the complete cleaning, repair, and preparation of the <br /> designated wall surface in advance of the mural installation.This includes providing equipment, <br /> materials, and labor necessary to ensure the wall is in optimal condition to receive mural <br /> artwork. <br /> 3. Materials& Equipment: <br /> • Artists will provide all materials, tools, lifts/scaffolding, and equipment required to complete <br /> the mural. <br /> • This includes but is not limited to: <br /> o Primer <br /> o Paints (UV/weather-resistant) <br /> o Brushes, rollers, sprayers <br /> o Drop cloths and tarps <br /> o Ladders, scaffolds, or lifts <br /> o PPE (Personal Protective Equipment) <br /> 4. Mural Execution: <br /> • Artists will paint the mural collaboratively, adhering to the approved design. <br /> Work will be conducted safely and respectfully during approved hours and within any public <br /> space guidelines, <br /> • Estimated duration for installation: 4 weeks (to be determined based on project timeline). <br /> S. Protective Coating: <br /> • Upon completion, artists will apply a clear, anti-graffiti protective coating to preserve the <br /> integrity and longevity of the mural. <br />