My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Agreements for On-Call Programmable Logic Controller Programming and Consulting Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 22 - Agreements for On-Call Programmable Logic Controller Programming and Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 10:46:16 AM
Creation date
9/10/2025 8:35:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Linda County Water District <br />Linda County Water Improvements (2024- Present) <br />ICS Online Inc. is providing turnkey services to upgrade LCWD Groundwater Treatment Plant PLC and <br />associated control back panels components for Well Sites 3/4, 12/14, 15, and 16. The services will <br />include identifying, documenting, labeling, and wiring components being used in the existing control <br />systems. The parts and labor cost contained in the ICS proposal were determined from a worst -case 10 <br />list created by ICS based of the project specifications. The existing control panel drawings, existing <br />Modicon Compact PLC programs, and information retrieved during the initial site visit were done by ICS <br />Electrical Engineer which will be the Project Manager and Engineering Manager for the project. As part <br />of this contract ICS will visit each wellsite to finalize the 10 list and existing system wiring. ICS provided <br />electrical schematics and a control description of the upgraded control system. ICS worked with LCWD <br />Staff to finalize the hand drawn P&ID as well as a wire termination list. ICS provided new Allen Bradley <br />PLC and HMI programs for the upgraded control system. ICS will replace the Well 16 Modicon Compact <br />PLC in place on the current back panel. The control panel back panels at the other well sites were <br />replaced with Factory wired and tested UL508A listed open control panels. ICS will provide engineering, <br />programming, onsite control panel wiring, onsite 10 testing, commissioning, and training. <br />111 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.