Laserfiche WebLink
Professional Experience: <br />2000-Present ICS Online Inc., Ripon CA. Engineering Manager/Lead Control Systems Engineer. Provide estimate <br />and sales support, Manage integration team of 3-5 control systems engineers, and 2-14 electrical technicians for <br />large plant and factory automation projects in the Power, chemical, petrol -chemical, pharmaceutical, <br />semiconductor, water treatment, and food industries. Worked with OEM's to designed and developed UL508A. <br />NBRX, and NNY control panels and SCADA systems for agriculture, food processing, semiconductor abatement, <br />toxic gas management, energy storage, wind turbines, solar trackers, hypochlorite generation, AGV's. Provide <br />onsite and remote support and ongoing for existing water treatment facilities instrumentation, motor control, <br />VFD's, PLC's and SCADA systems. Design and build projects for Well Site water treatment, lift stations and <br />distribution systems for public works. <br />2015-2025 Yosemite Community College District, Modesto CA— Adjunct Professor for College of Technical <br />Education. Developed and taught hands-on training of Rockwell Software on custom designed Automations <br />Trainers with Laptops, PLC, PAC, Servo Drives, VFD's and HMI to 5-20 students per semester. Software included <br />RS500, RS5000, Studio 500, Factory Talk View HMI and SCADA. <br />1996-2000 Engineered System Integration Inc., Walnut Creek CA. Lead Control Systems Engineer. Managed <br />engineering integration team of 2-4 control system engineers, for large plant and factory automation projects in <br />the Power, chemical, petrol -chemical, pharmaceutical, semiconductor, water treatment, and food industries. <br />Includes integration of large semiconductor fab for TI, oversaw the integration of 40 bulk chemical skids with <br />SLC504, 400 gas cabinets with GE9030's, and 32 facility PLC's with Siemens C5 PLC's into 4 FIX32 HMI's with oracle <br />data base. Retrofitted two large Power Plants for NCPA, replaced Foxboro DCS with redundant PLC 5/80's and 2 <br />redundant nodes of FIX32. Retrofitted NUMMI, truck pant facility, re -programmed 30 PLC 5/40's; add RFID <br />readers, and Wonderware Intouch HMI and ArchestrA SCADA. <br />1995-1996 Aspen Timco, Benicia CA. Control Systems Engineer — Oversaw the design and fabrication of UL <br />industrial control panels for the Chemical, Petrol -Chemical, Water Treatment, and Semiconductor Facilities. PLC <br />programming with AB SLC 500's, GE 9030's, GE 9070, Modicon 984. HMI Programming Wonderware, Fix32. <br />1994-1995 Cal Tech Control, Livermore CA. Sales Engineer for Industrial Control Components worked with <br />northern CA water and utility districts to develop specifications for power plants and water treatment plants using <br />Square D, Modicon, US Data Factory Link products. Created estimates and bills of material for customers including <br />system integrators and utility districts. Trained customers and assisted in start-ups and retrofit Modicon PLC and <br />Squared VFD's. <br />1992-1994 Advanced Environmental Dynamics, Vallejo CA. Engineering Manager oversaw the electrical and <br />mechanical design, fabrication, and installation of environmental research and production facilities including <br />Micro- Biology Research, Pharmaceutical Production, Optical Assembly, Plant Growth Chambers, and Clean <br />Rooms. Directly managed a CAD operator, mechanical engineer, two successfully completed designs and <br />fabrication of large optical assembly facility for the A-1 Abrams, for the US Army. Successfully over saw the design, <br />fabrication, and installation of over 40 Microbiology Research Chambers for UCLA, UCSD, and UCSC. Successfully <br />over saw the design, fabrication, and installation of 3 fully automated Plant Growth Chambers for USDA at UCR. <br />We built and programmed control panels in house with Modicon PLC and Honeywell Controls. We design and built <br />custom mechanical systems, including blowers, refrigeration systems, heaters, prefabricated wall systems, <br />structural steel, automatic temperature lighting and watering systems. <br />1991-1992 Wafab, San Ramon CA— Control Systems Engineer, over saw the manufacturing and electrical assembly <br />of wet etch semiconductor wafer processing equipment, including automated and automated wet benches. <br />Redesign circuit boards and UL listing equipment. Implemented first PLC designs PLC's and Operator Terminals. <br />1987 —1991 University of California Mass Spectrometry Facility, San Francisco CA - Electronic Technician, worked <br />to improve performance and data collection on several cutting -edge Mass Spectrometers. The lab had a dual Mass <br />Spectrometer used in cutting edge aids research. Maintained control circuitry, power supplies, vacuum and <br />cooling systems. I developed high voltage DC power supplies, and programmed Lab View SCADA systems. <br />