Laserfiche WebLink
rLbjol ICS Online Inc. <br />L -4 f____) www.icsonlineinacom <br />PERSONNEL PROFILE <br />Name: Bradley De Lap <br />Title: Automation Specialist <br />Program PLCs and Design HMI Interfaces to operate custom control systems. Create supporting <br />documents for system operation. Collaborate directly with customers to meet deadlines and ensure <br />correct system functionality. <br />Relevant Project Experience at ICS: <br />Needles, CA Program PLC, HMI, SCADA Interface <br />Well Site and Filter Control Panel Build with PLC and HMI, Programming, Control Panel FAT, 10 Check <br />Out startup and commissioning. Instruments included motorized valves, pumps, flow, pressure, level, <br />and intrusion. Controlled well pump VFD and Hypochlorite dosing pumps. Allen Bradley Compact Logix <br />1769 PLC with C-More HMI. <br />Linda County Well 17, CA Program PLC, HMI, SCADA Interface <br />ICS provided Well Site and Filter Control Panel, Well Site MCC with ATS, Reservoir and Distribution Pump <br />Station Control Panel, (5) Large VFD Control Panels, Distribution MCC and ATS. Build Control panels with <br />PLC and HMI, Programming, Control Panel FAT, 10 Check Out startup and commissioning. Instruments <br />included motorized valves, pumps, flow, pressure, level, and intrusion. Controlled well pump RVS, <br />Aeration Blower, (3) Sump Pumps, Hypochlorite generation and dosing pumps, and pressures stagging <br />control using. Allen Bradley Compact Logix 1769 PLC with (2) Panelview Plus 7 HMI, programmed <br />customer SCADA interface. <br />Linda County Water Improvements Program PLC, HMI, SCADA Interface <br />ICS Online Inc is providing turnkey services to upgrade LCWD Groundwater Treatment Plant PLC and <br />associated control back panels components for Well Sites 3/4, 12/14, 15, and 16. The services will <br />include identifying, documenting, labeling, and wiring components being used in the existing control <br />systems. The parts and labor cost contained in the ICS proposal were determined from a worst -case 10 <br />list created by ICS based of the project specifications. The existing control panel drawings, existing <br />Modicon Compact PLC programs, and information retrieved during the initial site visit were done by ICS <br />Electrical Engineer which will be the Project Manager and Engineering Manager for the project. As part <br />of this contract ICS will visit each wellsite to finalize the 10 list and existing system wiring. ICS provided <br />electrical schematics and a control description of the upgraded control system. ICS worked with LCWD <br />Staff to finalize the hand drawn P&ID as well as a wire termination list. ICS provided new Allen Bradley <br />PLC and HMI programs for the upgraded control system. ICS will replace the Well 16 Modicon Compact <br />PLC in place on the current back panel. The control panel back panels at the other well sites were <br />replaced with Factory wired and tested UL508A listed open control panels. ICS will provide engineering, <br />programming, onsite control panel wiring, onsite 10 testing, commissioning, and training. <br />